28.11.2014 Views

Sustainable Water Management Plan - Nillumbik Shire Council

Sustainable Water Management Plan - Nillumbik Shire Council

Sustainable Water Management Plan - Nillumbik Shire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Council</strong>-led community action Priority Responsibility Partners<br />

Objective 2: To reduce water use and encourage water efficiency in all <strong>Council</strong>’s<br />

operations and within the community.<br />

1.a Continue to promote sustainable gardening practices. 2007 EP and ID SGA<br />

1.b Investigate and implement planning and building controls/ 2008 EP, ID MW and<br />

assessment tools that encourage the principles of <strong>Water</strong> and SP DSE<br />

Sensitive Urban Design for residential and commercial<br />

developments.<br />

1.c Ensure DHS and EPA guidelines for the safe use of 2007 PH<br />

greywater in residential properties are available at the<br />

planning counter for applicants.<br />

1.d Ensure Victorian government guidelines that support the 2007 PBS<br />

installation of rainwater tanks in new and renovated<br />

residential and non-residential buildings, are available at the<br />

planning counter for applicants.<br />

1.e Continue to investigate further opportunities to showcase 2008 ESP MW, YVW,<br />

sustainable practices including water efficiency measures at<br />

DSE, SGA<br />

Edendale Farm Community Environment Centre and through<br />

and FG<br />

the <strong>Nillumbik</strong> <strong>Water</strong>Smart Sportsground Initiative program.<br />

1.f Promote water efficient business/households through 2010 EP and ED YVW<br />

a community recognition scheme.<br />

1.g Undertake a waterwise business program through the 2009 EP and ED YVW<br />

provision of water audits.<br />

<strong>Council</strong> action Priority Responsibility Partners<br />

2.1 Undertake water conservation audits on all <strong>Council</strong> annually EP YVW and FG<br />

owned buildings.<br />

2.2 Implement water reduction measures recommended annually EP and IM YVW, MW,<br />

in water audits.<br />

DSE<br />

and FG<br />

2.3 Install flow control valves into taps, showers and basins 2007 IM<br />

in all <strong>Council</strong> properties during regular maintenance<br />

procedures.<br />

2.4 Ensure trigger nozzles are installed on all hoses as per 2007 IM<br />

requirements of the Victorian Government’s Permanent<br />

<strong>Water</strong> Saving Rules.<br />

2.5 Install 4.5/3 dual flush toilets in all <strong>Council</strong> refurbishments, ongoing IM and ID<br />

developments.<br />

2.6 Install only AAA or above water-using appliances in all ongoing IM and ID<br />

<strong>Council</strong> facilities.<br />

2.7 Maintain awareness in current trends of wastewater reuse, ongoing PH<br />

and investigate its reuse where appropriate.<br />

2.8 Investigate and install waterless urinals where appropriate. 2009 and IM and ID<br />

2010<br />

2.9 Disconnect hot water systems in public toilets. 2008 IM<br />

2.10 Use rainwater or pool backwash water for reuse on road 2008 IM<br />

grading where possible.<br />

2.11 Continue to use drought tolerant plant species in all new Ongoing IM<br />

amenity plantings.<br />

2.12 Sustain current reduction in the amount of open Ongoing IM<br />

space irrigation.<br />

2.13 Continue to install centrally controlled irrigation systems Ongoing IM and LS<br />

at all irrigated sports grounds and the golf course.<br />

2.14 Use subsurface drip irrigation system in selected 2008 and LS, IM and ID DSE<br />

sportsgrounds. 2010<br />

2.15 Install flow control valves in all drinking fountains. 2007 IM<br />

2.16 Implement the <strong>Nillumbik</strong> <strong>Water</strong>Smart Sportsground 2006-2011 LS and PM DSE<br />

Initiative project.<br />

2.17 Incorporate warm season grasses onto all sports grounds. ongoing IM and LS<br />

2.18 Conduct regular irrigation system audits and maintenance. ongoing IM<br />

2.19 Continue to incorporate group planting of plant species ongoing IM<br />

with similar water needs, or hydrozones into all new planting.<br />

2.20 Investigate re-fill and top-up options for water features 2008 IM<br />

where appropriate.<br />

22 <strong>Sustainable</strong> <strong>Water</strong> <strong>Management</strong> <strong>Plan</strong> <strong>Sustainable</strong> <strong>Water</strong> <strong>Management</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!