28.11.2014 Views

Medicare Advantage and Prescription Drug Plans December 28 ...

Medicare Advantage and Prescription Drug Plans December 28 ...

Medicare Advantage and Prescription Drug Plans December 28 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Plan Communications User Guide Appendices, Version 6.3<br />

Code Type Title Short Definition Definition<br />

057 M Risk Adjuster Factor<br />

Change<br />

111 R PBP Rejected; Invalid<br />

Contract Number<br />

112 R Rejected; Conflicting<br />

Effective Dates<br />

115 R Enrollment Rejected;<br />

Plan Not Open<br />

OBSOLETE<br />

OBSOLETE<br />

OBSOLETE<br />

OBSOLETE<br />

This is an informational TRC.<br />

The Risk Adjuster System (RAS) has created new factors for this beneficiary, which<br />

may result in payment adjustments.<br />

Plan Action: Refer to the monthly RAS reports to update the Plan’s records.<br />

A PBP enrollment change transaction (Transaction Type 61) was rejected because the<br />

contract number submitted on the transaction does not match the contract number of<br />

the Plan in which the beneficiary is currently enrolled. The requested effective date of<br />

enrollment in the new PBP is reported in TRR data file field 18.<br />

Plan Action: If appropriate, resubmit the transaction with the correct contract<br />

number. If the Plan is attempting to move the beneficiary to a new contract number,<br />

an enrollment transaction (Transaction Type 61) must be used.<br />

A PBP change transaction (Transaction Type 61) was rejected because beneficiary<br />

was not enrolled in the submitted contract as of the effective date for the PBP change.<br />

A beneficiary must be enrolled in a PBP of a contract in order to change to another<br />

PBP. The effective date of the enrollment within the contract must be equal to or<br />

before the effective date of the PBP change.<br />

Plan Action: Correct the effective date of the PBP Change transaction <strong>and</strong> resubmit<br />

if appropriate. If the Plan is attempting to enroll a beneficiary in a different PBP with<br />

an effective date earlier than the original enrollment, the Plan must us an Enrollment<br />

transaction (Transaction Type 61).<br />

An enrollment or PBP change transaction (Transaction Type 61) was rejected because<br />

this Plan is closed to enrollments using an O (OEP), N (OEPNEW) or OEPI (T)<br />

election type.<br />

Plan Action: Correct the enrollment type <strong>and</strong> resubmit the transaction if appropriate.<br />

<strong>December</strong> <strong>28</strong>, 2012 I-85 Obsolete Transaction Reply Code (TRCs)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!