28.11.2014 Views

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Black Oil System: Cold Restart<br />

• Achievable restart rates determined by:<br />

• Shut-in conditions<br />

• Fluid GOR<br />

• Water cut<br />

• Hydrate inhibitor<br />

• “Rule of Thumb”: Greater inhibitor injection rates result in<br />

lower overall inhibitor volumes used during restart<br />

• Small tiebacks: 5-10 gpm / well<br />

• Large deepwater: 25+ gpm / well<br />

• Warm-up trends:<br />

• Wellbore: Very quick (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!