Deepwater Field Development - Flow Assurance - Dynamic ...
Deepwater Field Development - Flow Assurance - Dynamic ... Deepwater Field Development - Flow Assurance - Dynamic ...
• Is there sufficient time to accomplish displacement operation? • Sufficient insulation / Cooldown time • Is the topsides facility designed to accomplish displacement operation? • Pump capacity • Storage capacity Black Oil System: Displacement Checklist • Can system be restarted into crude-oil filled flowline? • Displace with gas? • High pour point fluids – what is the restart pressure required? • For dry trees, is a proper fluid available for displacement?
Black Oil Systems: Restart Design Considerations
- Page 17 and 18: Key Flow Assurance Issues •Other
- Page 19 and 20: Deepwater: Temperature Losses • P
- Page 21 and 22: Deepwater: Temperature Losses Flowl
- Page 23 and 24: Transient Temperature Loss 110 100
- Page 25 and 26: Deepwater: Pressure Losses Flowline
- Page 27 and 28: Dry Tree: Conduction / Convection /
- Page 29 and 30: Dry Tree: Concentric vs. Non-Concen
- Page 31 and 32: Design for Expansion • Transient
- Page 33 and 34: Emerging Technologies • Artificia
- Page 35 and 36: Design Considerations: Black Oil an
- Page 37 and 38: Black Oil System: Transient Design
- Page 39 and 40: Black Oil System: Steady State Hydr
- Page 41 and 42: Black Oil System: Slugging • Slug
- Page 43 and 44: Black Oil System: Steady State Ther
- Page 45 and 46: Black Oil System: Steady State Ther
- Page 47 and 48: Black Oil Systems: Cooldown Design
- Page 49 and 50: Black Oil System: Cooldown • Plan
- Page 51 and 52: Black Oil System: Cooldown • Insu
- Page 53 and 54: Black Oil System: Cooldown 6000 550
- Page 55 and 56: Black Oil System: Cooldown 60 WELLH
- Page 57 and 58: Black Oil Systems: Depressurization
- Page 59 and 60: Depressurization:Subsea Tieback 450
- Page 61 and 62: Black Oil System: Depressurization
- Page 63 and 64: • During “Prevention” time, d
- Page 65 and 66: Black Oil System: Displacement Hydr
- Page 67: Black Oil System: Displacement Hydr
- Page 71 and 72: Black Oil System: Cold Restart 0.60
- Page 73 and 74: Black Oil System: Cold Restart •
- Page 75 and 76: Black Oil System: Cold Restart
- Page 77 and 78: Cold Restart: Case Study 15 Mile Ti
- Page 79 and 80: • Is there sufficient hydrate inh
Black Oil Systems:<br />
Restart Design Considerations