28.11.2014 Views

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Is there sufficient time to accomplish displacement<br />

operation?<br />

• Sufficient insulation / Cooldown time<br />

• Is the topsides facility designed to accomplish displacement<br />

operation?<br />

• Pump capacity<br />

• Storage capacity<br />

Black Oil System:<br />

Displacement Checklist<br />

• Can system be restarted into crude-oil filled flowline?<br />

• Displace with gas?<br />

• High pour point fluids – what is the restart pressure required?<br />

• For dry trees, is a proper fluid available for displacement?

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!