28.11.2014 Views

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Black Oil System: Displacement<br />

Hydrate Prevention – Dry Tree<br />

• During shutdown, how quickly will fluids fall below<br />

SCSSV?<br />

• Very little work done with L/D ratios >100 (deepwater riser<br />

~10000)<br />

• <strong>Field</strong> data shows oil/water separation ~ 70-80 ft/hr<br />

• Bullhead / displace with non-hydrate forming<br />

chemical to SCSSV<br />

• Methanol/MEG (volume concerns)<br />

• Heavy diesel (high density, by-pass produced fluids)<br />

• Dead oil<br />

• Ability to bullhead a function of displacement rate

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!