28.11.2014 Views

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Black Oil System:<br />

Cooldown Checklist<br />

• Is there adequate chemical injection to treat subsea components within<br />

cooldown time?<br />

• Wellbore<br />

• Trees<br />

• Jumpers<br />

• Manifolds<br />

• What is the subsea valve closure philosophy?<br />

• Packed: More liquid / higher pressures<br />

• Un-packed: Less liquid / lower pressures<br />

• Does insulation provide sufficient cooldown time?<br />

• No-touch<br />

• Light-touch<br />

• Preservation<br />

• Is gel formation a possibility?<br />

• If yes, system design philosophy changes<br />

• Is SCSSV set deep enough to avoid hydrates?

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!