Black Oil System: Cooldown 140 0 hours (Steady State) 130 120 110 RESERVOIR WELLHEAD FLOWLINE 1 hours 2 hours 4 hours 6 hours 8 hours 10 hours 100 12 hours 18 hours Temperature (F) 90 80 24 hours 70 60 50 40 RISER 30 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 Distance (miles)
Black Oil System: Cooldown 6000 5500 5000 RESERVOIR 0 hours (Steady State) 24 hours 4500 4000 WELLHEAD Pressure (psia) 3500 3000 2500 2000 FLOWLINE 1500 RISER 1000 500 0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 Distance (miles)
- Page 1 and 2: DP Conference MTS Symposium Flow As
- Page 3 and 4: Flow Assurance Overview
- Page 5 and 6: Key Flow Assurance Issues •Wax (P
- Page 7 and 8: Key Flow Assurance Issues Example W
- Page 9 and 10: Key Flow Assurance Issues •Wax De
- Page 11 and 12: Key Flow Assurance Issues •Hydrat
- Page 13 and 14: Key Flow Assurance Issues •Hydrat
- Page 15 and 16: Key Flow Assurance Issues •Sluggi
- Page 17 and 18: Key Flow Assurance Issues •Other
- Page 19 and 20: Deepwater: Temperature Losses • P
- Page 21 and 22: Deepwater: Temperature Losses Flowl
- Page 23 and 24: Transient Temperature Loss 110 100
- Page 25 and 26: Deepwater: Pressure Losses Flowline
- Page 27 and 28: Dry Tree: Conduction / Convection /
- Page 29 and 30: Dry Tree: Concentric vs. Non-Concen
- Page 31 and 32: Design for Expansion • Transient
- Page 33 and 34: Emerging Technologies • Artificia
- Page 35 and 36: Design Considerations: Black Oil an
- Page 37 and 38: Black Oil System: Transient Design
- Page 39 and 40: Black Oil System: Steady State Hydr
- Page 41 and 42: Black Oil System: Slugging • Slug
- Page 43 and 44: Black Oil System: Steady State Ther
- Page 45 and 46: Black Oil System: Steady State Ther
- Page 47 and 48: Black Oil Systems: Cooldown Design
- Page 49 and 50: Black Oil System: Cooldown • Plan
- Page 51: Black Oil System: Cooldown • Insu
- Page 55 and 56: Black Oil System: Cooldown 60 WELLH
- Page 57 and 58: Black Oil Systems: Depressurization
- Page 59 and 60: Depressurization:Subsea Tieback 450
- Page 61 and 62: Black Oil System: Depressurization
- Page 63 and 64: • During “Prevention” time, d
- Page 65 and 66: Black Oil System: Displacement Hydr
- Page 67 and 68: Black Oil System: Displacement Hydr
- Page 69 and 70: Black Oil Systems: Restart Design C
- Page 71 and 72: Black Oil System: Cold Restart 0.60
- Page 73 and 74: Black Oil System: Cold Restart •
- Page 75 and 76: Black Oil System: Cold Restart
- Page 77 and 78: Cold Restart: Case Study 15 Mile Ti
- Page 79 and 80: • Is there sufficient hydrate inh
Black Oil System: Cooldown<br />
140<br />
0 hours (Steady State)<br />
130<br />
120<br />
110<br />
RESERVOIR<br />
WELLHEAD<br />
FLOWLINE<br />
1 hours<br />
2 hours<br />
4 hours<br />
6 hours<br />
8 hours<br />
10 hours<br />
100<br />
12 hours<br />
18 hours<br />
Temperature (F)<br />
90<br />
80<br />
24 hours<br />
70<br />
60<br />
50<br />
40<br />
RISER<br />
30<br />
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0<br />
Distance (miles)