Deepwater Field Development - Flow Assurance - Dynamic ...
Deepwater Field Development - Flow Assurance - Dynamic ...
Deepwater Field Development - Flow Assurance - Dynamic ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Black Oil System: Cooldown<br />
• Planned shutdown Procedure<br />
• Inject hydrate inhibitor for one residence time<br />
(minimum)<br />
• At high water cuts, may need to reduce flowrate to<br />
effectively treat system<br />
• Inject hydrate inhibitor into subsea equipment<br />
• Particular attention to horizontal components<br />
• Self-draining manifold / jumpers<br />
• Treat upper portion of wellbore<br />
• SCSSV vs. top ~50 ft<br />
• Shut-in system