28.11.2014 Views

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

Deepwater Field Development - Flow Assurance - Dynamic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Black Oil System: Slugging<br />

• Hydrodynamic<br />

• High frequency<br />

• Minimal facilities impact<br />

7<br />

6<br />

5<br />

4<br />

Hydrodynamic Slugging<br />

Gas Outlet <strong>Flow</strong><br />

3<br />

2<br />

1<br />

• Terrain<br />

• High liquid / gas flowrates<br />

• Topsides concern<br />

• Riser fatigue concern<br />

• Utilize gas lift<br />

0<br />

1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0<br />

80000<br />

70000<br />

60000<br />

50000<br />

40000<br />

30000<br />

20000<br />

Time (hours)<br />

Terrain Slugging<br />

Liquid Outlet <strong>Flow</strong><br />

10000<br />

0<br />

1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0<br />

Time (hours)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!