Deepwater Field Development - Flow Assurance - Dynamic ...
Deepwater Field Development - Flow Assurance - Dynamic ... Deepwater Field Development - Flow Assurance - Dynamic ...
Design for Expansion 22.5 km 10 km 8 km 8 km Total Time to Displace Existing System = 22 Hours (Sequential) Total Time to Displace Integrated System = 45 Hours (Sequential) High Level Insulation, or Additional Topsides Facilities Required!
Emerging Technologies • Artificial Lift • Subsea Separation (-) • Multiphase Pumping (+) • Gas Lift (+ / -) • Passive Insulation Solutions • Microporous Insulation • Phase Change Materials
- Page 1 and 2: DP Conference MTS Symposium Flow As
- Page 3 and 4: Flow Assurance Overview
- Page 5 and 6: Key Flow Assurance Issues •Wax (P
- Page 7 and 8: Key Flow Assurance Issues Example W
- Page 9 and 10: Key Flow Assurance Issues •Wax De
- Page 11 and 12: Key Flow Assurance Issues •Hydrat
- Page 13 and 14: Key Flow Assurance Issues •Hydrat
- Page 15 and 16: Key Flow Assurance Issues •Sluggi
- Page 17 and 18: Key Flow Assurance Issues •Other
- Page 19 and 20: Deepwater: Temperature Losses • P
- Page 21 and 22: Deepwater: Temperature Losses Flowl
- Page 23 and 24: Transient Temperature Loss 110 100
- Page 25 and 26: Deepwater: Pressure Losses Flowline
- Page 27 and 28: Dry Tree: Conduction / Convection /
- Page 29 and 30: Dry Tree: Concentric vs. Non-Concen
- Page 31: Design for Expansion • Transient
- Page 35 and 36: Design Considerations: Black Oil an
- Page 37 and 38: Black Oil System: Transient Design
- Page 39 and 40: Black Oil System: Steady State Hydr
- Page 41 and 42: Black Oil System: Slugging • Slug
- Page 43 and 44: Black Oil System: Steady State Ther
- Page 45 and 46: Black Oil System: Steady State Ther
- Page 47 and 48: Black Oil Systems: Cooldown Design
- Page 49 and 50: Black Oil System: Cooldown • Plan
- Page 51 and 52: Black Oil System: Cooldown • Insu
- Page 53 and 54: Black Oil System: Cooldown 6000 550
- Page 55 and 56: Black Oil System: Cooldown 60 WELLH
- Page 57 and 58: Black Oil Systems: Depressurization
- Page 59 and 60: Depressurization:Subsea Tieback 450
- Page 61 and 62: Black Oil System: Depressurization
- Page 63 and 64: • During “Prevention” time, d
- Page 65 and 66: Black Oil System: Displacement Hydr
- Page 67 and 68: Black Oil System: Displacement Hydr
- Page 69 and 70: Black Oil Systems: Restart Design C
- Page 71 and 72: Black Oil System: Cold Restart 0.60
- Page 73 and 74: Black Oil System: Cold Restart •
- Page 75 and 76: Black Oil System: Cold Restart
- Page 77 and 78: Cold Restart: Case Study 15 Mile Ti
- Page 79 and 80: • Is there sufficient hydrate inh
Design for Expansion<br />
22.5 km<br />
10 km<br />
8 km 8 km<br />
Total Time to Displace Existing System = 22 Hours (Sequential)<br />
Total Time to Displace Integrated System = 45 Hours (Sequential)<br />
High Level Insulation, or Additional Topsides Facilities Required!