Deepwater Field Development - Flow Assurance - Dynamic ...
Deepwater Field Development - Flow Assurance - Dynamic ...
Deepwater Field Development - Flow Assurance - Dynamic ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Key <strong>Flow</strong> <strong>Assurance</strong> Issues<br />
•Hydrates – Base Information<br />
Methanol Dosage, Methanol BBL MeOH/BBL Rate, gpm Water<br />
50<br />
0.600<br />
45<br />
0.575<br />
0.550 40<br />
0.525 35<br />
0.500<br />
30<br />
0.475<br />
25<br />
0.450<br />
20<br />
0.425<br />
0.400 15<br />
0.375<br />
10<br />
5% Water Cut<br />
10% Water Cut<br />
20% Water Cut<br />
25% Water Cut<br />
30% Water Cut<br />
40% Water Cut<br />
50% Water Cut<br />
25 GPM<br />
0.350<br />
761 GOR 1100 GOR<br />
5<br />
0.325<br />
1700 GOR 2500 GOR<br />
0<br />
0.300<br />
1000 2000 3000 4000 5000 6000 7000 8000 9000 10000<br />
50 75 100 125 150 175 200 225 250 275 300<br />
Shut-in <strong>Flow</strong>rate, Pressure, B/d bara