<strong>Bybanen</strong> i <strong>Bergen</strong><br />

The <strong>Bergen</strong> light rail<br />

Light rail as an urban developer<br />

Håkon Rasmussen<br />

Planning manager<br />

<strong>Bybanen</strong> i <strong>Bergen</strong><br />

October 10th, 2012


Agenda<br />

• Short history<br />

• Finance scheme<br />

• The network – masterplan<br />

• Phase 1-4<br />

• Developing the city with light rail


Short history


A political project !<br />

• Long history ,<br />

since the tram<br />

• City politicians<br />

have carried<br />

the project<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


• Congestion<br />

• Buses struggling<br />

• Environmental problems<br />

• Light rail report 1996<br />

• Masterplan 2000


<strong>Bergen</strong>:<br />

CITY OF BERGEN<br />

• 60¤ north<br />

<strong>Bybanen</strong> i <strong>Bergen</strong><br />

• area 465.3 km 2<br />

• population 250 000<br />

• population density 496<br />

• average temperature:<br />

July 13.5C January 1.5C<br />

• average rainfall:<br />

2 250 mm / year


Or like this........


Finance scheme


Toll ring<br />

• Established 1986 – to<br />

finance highways<br />

• A perfect money –<br />

machine!<br />

• Long Norwegian<br />

tradition<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


The <strong>Bergen</strong> programme<br />

• Transport,<br />

development and<br />

environment<br />

• Toll and state<br />

• 1,7 billion euro 2002<br />

– 2025<br />

• Two main projects<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


The light rail - <strong>Bybanen</strong><br />

• Phase 1 – 320 mill €<br />

• Phase 2 – 180 mill €<br />

• Both under budget<br />

• And on time!<br />

• Phase 3 – 425 mill €<br />

incl workshop<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


The network – masterplan


Housing<br />

Population: 260 000<br />

20% city centre<br />

30% south corridor<br />

50% other<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


Workplaces<br />

Jobs: 126 500<br />

48% city centre<br />

30% south corridor<br />

22% other<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


• Two lines<br />

• Ca 40 km<br />

• Over 80% workplaces<br />

• 50% inhabitants (housing)<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


City master plan<br />

• Strong focus on a denser<br />

city:<br />

• District centres<br />

• Light rail stops<br />

• Local centres<br />

• Transformation<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


Buildt up areas


<strong>Bybanen</strong><br />

«connecting the<br />

dots»


Strengthening and<br />

densifying<br />

With quality !


Network - masterplan<br />

• December 2009<br />

• Extent of network<br />

• Phases<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>


<strong>Bybanen</strong> til Flesland


Phase 1-4


<strong>Bybanen</strong> – phase 1<br />

Sentrum – Nesttun<br />

- 9,8 km track length<br />

- 13 stops<br />

- 2 terminals<br />

Economy<br />

- Budget Basis (2007 kr)<br />

2.400 mill.kr


Rolling stock – 1<br />

phase<br />

– 12 trams<br />

– 220 passengers<br />

– 32m long<br />

– 42m extension<br />

– Supplier<br />

Stadler Pankow,<br />

Berlin


Grand opening, June 2010<br />

<strong>Bybanen</strong> i <strong>Bergen</strong><br />

Kilde: BT


<strong>Bybanen</strong> – phase 2<br />

Nesttun<br />

Nesttun – Rådalen<br />

– 3.6 km<br />

– 5 stops<br />

– 2 tunnels<br />

– 4 min headway<br />

– 5 new trams<br />

– Opening June 2013<br />

Nesttunhaugtunnelen<br />

Skjoldskiftet<br />

Mårdalen<br />

Skjoldtunnelen<br />

Skjold<br />

Lagunen


<strong>Bybanen</strong> – phase 3<br />

• 7 km<br />

• 6 tunnels<br />

• 7 stops<br />

• 2016 (?)<br />

Currently in detailed design


Integration in new<br />

airport terminal


Workshop and depot


<strong>Bybanen</strong> – phase 4<br />

Preliminary studies<br />

10 km<br />

Historical city centre<br />

World heritage<br />

Narrow corridor


Vågsalmenningen


Tunnelinnslag v Finnegården


Developing the city with light rail


Hva skjer langs bybanen<br />

What is happening along<br />

<strong>Bybanen</strong> ?


New court building


City redevelopment


Marineholmen, education, research and business


Solheimsviken, bank, business, convention centre, hotell


Office - Health<br />

Opens 2013<br />

10.500 m2


Kronstadparken: housing and offices


New College of <strong>Bergen</strong><br />

5000 students, 1500 staff


Wergeland:<br />

Housing<br />

Offices<br />

Shops


Sletten: shopping centre


New student housing


Paradis: plans for 1000 new flats + offices and shops


Nesttun<br />

City<br />

redevelopment<br />

Housing


Lagunen: end stop phase 2, major city redevelopment


Thank you for your attention !<br />

<strong>Bybanen</strong> i <strong>Bergen</strong>