Appendix C - Cultural Heritage Impact Assessment - Peabody Energy
Appendix C - Cultural Heritage Impact Assessment - Peabody Energy
Appendix C - Cultural Heritage Impact Assessment - Peabody Energy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Date Consultation Description Method of Contact Outcomes<br />
17/06/2011 Proposed methodology mailed to Aboriginal Native Title Consultants, Bullem Bullem <strong>Heritage</strong> Consultants, Cacatua<br />
Culture Consultants, Carrawonga Consultants, <strong>Cultural</strong>ly Aware, Gidawaa Waland <strong>Cultural</strong> <strong>Heritage</strong> Consultancy,<br />
Giwiirr Consultants, HTO Environmental Management Services, Hunter Valley Aboriginal Corporation, Hunter<br />
Valley <strong>Cultural</strong> Consultants, Hunter Valley <strong>Cultural</strong> Surveying, Hunter Valley Natural & <strong>Cultural</strong> Resources<br />
Mangement, Kayaway Eco-<strong>Cultural</strong> and <strong>Heritage</strong> Services, Lower Hunter Wonnarua Council Inc, Mingaa<br />
Consultants, Muronga Gialinga, Muswellbrook <strong>Cultural</strong> Consultants, Ungooroo Aboriginal Corporation, Ungooroo<br />
<strong>Cultural</strong> & Community Services,Upper Hunter <strong>Heritage</strong> Consultants, Upper Hunter Wonnarua Council Inc, Valley<br />
Culture, Wanaruah Custodians Aboriginal Corporation, Wararuah Local Aboriginal Land Council, Wattaka<br />
Wonnarua <strong>Cultural</strong> Consultants, Widescope Indigenous Group Pty Ltd, Wonn 1 Contracting, Wonnarua <strong>Cultural</strong><br />
<strong>Heritage</strong>, Wonnarua Elders Council, Wonnarua Nation Aboriginal Corporation, Yarrawalk division of Tocomwall,<br />
Yinaar <strong>Cultural</strong> Services.<br />
Mail<br />
Proposed methodology provided to registered stakeholder groups for their comment. Comments on the<br />
proposed methodology due 15/07/2011<br />
30/06/2011 Response recived from Donna Sampson of Cacatua <strong>Cultural</strong> Consulting. Phone Donna Sampson said Cacatua Culture Consultants would provide comments on the proposed methodology in<br />
writing by 06/06/2011.<br />
5/07/2011 Response received from Donna Sampson of Cacatua Culture Consultants. Email Donna Sampson requested that Cacatua Culture Consultants be provided with a copy of the proposed<br />
methodology.Donna Sampson was contacted and she confirmed that Cacatua Culture Consultants had<br />
changed postal address. She also advised that the proposed methodology had been fowarded from the old<br />
postal address and she no longer required a copy. The change of address was noted for all future<br />
correspondence.<br />
7/07/2011 Response received from Laurie Perry of Wonnarua Nation Aboriginal Corporation Fax Wonnarua Nation Aboriginal Corporation was in agreement with the methodology however raised concerns<br />
about impact of the Project on the Bora Ground and the cultural significance of the area. Their response to the<br />
methodology was noted and their concerns have been addressed in the ACHA.<br />
7/07/2011 Response received from Gordon Griffiths of Wonnarua <strong>Cultural</strong> <strong>Heritage</strong>. Phone Gordon Griffiths confirmed that Wonnarua <strong>Cultural</strong> <strong>Heritage</strong> was a registered stakeholder group. Gordon<br />
Griffiths also said Wonnarua <strong>Cultural</strong> <strong>Heritage</strong> would provide comments on the proposed methodology.<br />
12/07/2011 Response received from Shannon Griffiths of Wonnarua Culture <strong>Heritage</strong> Fax Wonnarua Nation Aboriginal Corporation was in agreement with the methodology and requested that meeting to<br />
be held with alll groups involved to discuss the project.<br />
18/07/2011 Response received from Kathie Steward Kinchela of Yinarr <strong>Cultural</strong> Services Email Yinarr <strong>Cultural</strong> Services requested that they be provided with a copy of the proposed methodology. Kathie<br />
Steward Kinchela confirmed that they had changed postal address. A copy of the methodology was emailed to<br />
Yinarr <strong>Cultural</strong> Services and the change of postal address was noted for future correspondence.<br />
19/07/2011 Response received from Tegan McCormack of Cacatua Culture Consultants Fax Cacatua Culture Consultants agreed with the methodology and requested that they be given the opportunity to<br />
survey all areas considered to be culturally significant.Response to methodology noted.<br />
19/07/2011 Response received from Suzie Worth of Wanaruah LALC Phone Response to methodology noted. Wanaruah LALC had concerns regarding the proximity of the project to the<br />
Bora Ground and the potential impacts on Aboriginal culture and heritage values.Their response to<br />
methodology was noted and their concerns have been addressed in the ACHA.<br />
21/07/2011 Letters sent out to Hunter Valley Aboriginal Corporation, Yinaar <strong>Cultural</strong> Services, Ungooroo Aboriginal<br />
Corporation, Giwiirr Consultants, Wonnarua <strong>Cultural</strong> <strong>Heritage</strong>, Upper Hunter Wonnarua Council Inc, Ungooroo<br />
<strong>Cultural</strong> & Community Services, Wonn 1 Contracting, Hunter Valley <strong>Cultural</strong> Surveying, Wararuah Local Aboriginal<br />
Land Council, HTO Environmental Management Services, Wonnarua Nation Aboriginal Corporation.<br />
Email<br />
Invitation to attend field survey.<br />
21/07/2011 Emails sent out to Hunter Valley Aboriginal Corporation, Yinaar <strong>Cultural</strong> Services, Ungooroo Aboriginal<br />
Corporation, Giwiirr Consultants, Wonnarua <strong>Cultural</strong> <strong>Heritage</strong>, Upper Hunter Wonnarua Council Inc, Ungooroo<br />
<strong>Cultural</strong> & Community Services, Wonn 1 Contracting, Hunter Valley <strong>Cultural</strong> Surveying, Wararuah Local Aboriginal<br />
Land Council, HTO Environmental Management Services, Wonnarua Nation Aboriginal Corporation.<br />
Email/Fax<br />
Invitation to attend field survey.<br />
21/07/2011 Response received from Taasha Layer of Ungooroo Aboriginal Corporation Email Taasha Layer confirmed a representative from Ungooroo Aboriginal Corporation would be attending the field<br />
surveys.<br />
21/07/2011 Response received from Paulette Ryan of HTO Environmental Management Services. Mail Paulette Ryan confirmed a representative from HTO Environmental Management Services would be attending<br />
the field surveys. Insurance details sent for HTO Environmental Management Services were out of date and<br />
renewed insurances were requested.<br />
23/07/2011 Response received from Kathie Steward Kinchela of Yinarr <strong>Cultural</strong> Services. Email Yinarr <strong>Cultural</strong> Services agreed with the proposed methodology. Their response was noted.