<strong>Cultural</strong> <strong>Heritage</strong> <strong>Impact</strong> <strong>Assessment</strong><br />
North Wambo Underground Mine Modification<br />
Table 18 Summary of potential impacts, risks to heritage and mitigation options<br />
<strong>Impact</strong> Risk to <strong>Heritage</strong> Mitigation Option 1<br />
Mine<br />
Subsidence<br />
Vehicle<br />
Movement/<br />
Subsidence<br />
Mitigation<br />
Works<br />
Surface<br />
Infrastructure<br />
Vandalism<br />
Based on the subsidence<br />
predictions for surface<br />
movement and potential soil<br />
cracking in MSEC (2012)<br />
(and provided in Table 17),<br />
risk of substantial impacts to<br />
Aboriginal heritage is<br />
considered negligible to low.<br />
Direct disturbance/ damage<br />
to cultural heritage sites.<br />
Direct disturbance/ damage<br />
to cultural heritage sites.<br />
Direct disturbance/ damage<br />
to cultural heritage sites.<br />
Subsidence monitoring<br />
to ensure subsidence<br />
movements are as<br />
predicted (details to be<br />
included in a<br />
Subsidence<br />
Management Plan)<br />
Avoid; ensure relevant<br />
Wambo Coal<br />
Environmental Officer<br />
and personnel are<br />
given site locations.<br />
Avoid; locate<br />
subsidence mitigation<br />
works to prevent<br />
impacts on Aboriginal<br />
cultural heritage.<br />
Locate required surface<br />
infrastructure within<br />
limit of existing<br />
approved disturbance<br />
areas.<br />
Avoid impact to known<br />
heritage sites; ensure<br />
Wambo Coal<br />
Environmental Officer<br />
and relevant personnel.<br />
Avoid; ensure Wambo<br />
Coal Environmental<br />
Officer and relevant<br />
personnel are given<br />
site locations.<br />
8.2 Principles of Ecologically Sustainable Development<br />
Mitigation<br />
Option 2<br />
Move artefacts<br />
under an AHIP to<br />
location outside<br />
impact area if<br />
subsidence<br />
monitoring<br />
identifies cracking<br />
or erosion<br />
proximal to a site.<br />
Cordon off site<br />
area or prevent<br />
vehicular access<br />
to site.<br />
Cordon off site<br />
area to prevent<br />
accidental<br />
damage.<br />
Cordon off site<br />
area and block<br />
access route to<br />
restrict vehicular<br />
access to sites.<br />
Mitigation<br />
Option 3<br />
NA<br />
Move artefacts<br />
under an AHIP to<br />
location outside<br />
impact area.<br />
Move artefacts<br />
under an AHIP to<br />
location outside<br />
impact area.<br />
Site awareness<br />
and sensitivity<br />
education<br />
programme.<br />
The principles of ecologically sustainable development need to be considered under Section 2A of the NPW<br />
Act. Inter-generational equity is part of these principles, which allows future generations to access the<br />
cultural and environmental diversity of the present generation.<br />
Inter-generational equity has been considered as part of the assessment of significance. State significant<br />
Aboriginal sites should be considered for blanket protection for future generations, as these sites have been<br />
assessed as having highest significance within NSW.<br />
No Aboriginal sites of state significance were identified in this assessment.<br />
108453-2; October 2012 Page 54