<strong>Cultural</strong> <strong>Heritage</strong> <strong>Impact</strong> <strong>Assessment</strong><br />

North Wambo Underground Mine Modification<br />

Table 18 Summary of potential impacts, risks to heritage and mitigation options<br />

<strong>Impact</strong> Risk to <strong>Heritage</strong> Mitigation Option 1<br />

Mine<br />

Subsidence<br />

Vehicle<br />

Movement/<br />

Subsidence<br />

Mitigation<br />

Works<br />

Surface<br />

Infrastructure<br />

Vandalism<br />

Based on the subsidence<br />

predictions for surface<br />

movement and potential soil<br />

cracking in MSEC (2012)<br />

(and provided in Table 17),<br />

risk of substantial impacts to<br />

Aboriginal heritage is<br />

considered negligible to low.<br />

Direct disturbance/ damage<br />

to cultural heritage sites.<br />

Direct disturbance/ damage<br />

to cultural heritage sites.<br />

Direct disturbance/ damage<br />

to cultural heritage sites.<br />

Subsidence monitoring<br />

to ensure subsidence<br />

movements are as<br />

predicted (details to be<br />

included in a<br />

Subsidence<br />

Management Plan)<br />

Avoid; ensure relevant<br />

Wambo Coal<br />

Environmental Officer<br />

and personnel are<br />

given site locations.<br />

Avoid; locate<br />

subsidence mitigation<br />

works to prevent<br />

impacts on Aboriginal<br />

cultural heritage.<br />

Locate required surface<br />

infrastructure within<br />

limit of existing<br />

approved disturbance<br />

areas.<br />

Avoid impact to known<br />

heritage sites; ensure<br />

Wambo Coal<br />

Environmental Officer<br />

and relevant personnel.<br />

Avoid; ensure Wambo<br />

Coal Environmental<br />

Officer and relevant<br />

personnel are given<br />

site locations.<br />

8.2 Principles of Ecologically Sustainable Development<br />

Mitigation<br />

Option 2<br />

Move artefacts<br />

under an AHIP to<br />

location outside<br />

impact area if<br />

subsidence<br />

monitoring<br />

identifies cracking<br />

or erosion<br />

proximal to a site.<br />

Cordon off site<br />

area or prevent<br />

vehicular access<br />

to site.<br />

Cordon off site<br />

area to prevent<br />

accidental<br />

damage.<br />

Cordon off site<br />

area and block<br />

access route to<br />

restrict vehicular<br />

access to sites.<br />

Mitigation<br />

Option 3<br />

NA<br />

Move artefacts<br />

under an AHIP to<br />

location outside<br />

impact area.<br />

Move artefacts<br />

under an AHIP to<br />

location outside<br />

impact area.<br />

Site awareness<br />

and sensitivity<br />

education<br />

programme.<br />

The principles of ecologically sustainable development need to be considered under Section 2A of the NPW<br />

Act. Inter-generational equity is part of these principles, which allows future generations to access the<br />

cultural and environmental diversity of the present generation.<br />

Inter-generational equity has been considered as part of the assessment of significance. State significant<br />

Aboriginal sites should be considered for blanket protection for future generations, as these sites have been<br />

assessed as having highest significance within NSW.<br />

No Aboriginal sites of state significance were identified in this assessment.<br />

108453-2; October 2012 Page 54