26.11.2014 Views

Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Cultural</strong> <strong>Heritage</strong> <strong>Impact</strong> <strong>Assessment</strong><br />

North Wambo Underground Mine Modification<br />

located close to access roads and tracks in this survey unit included previously recorded sites Wambo Site<br />

55 (AHIMS #37-5-0298), Wambo Site 56 (AHIMS #37-5-0299), Wambo Site 61 (AHIMS #37-5-0304). In<br />

addition newly recorded sites Wambo Site 352 (AS B), Wambo Site 353 (AS C) and Wambo Site 357 (AS Z)<br />

were identified on the south facing slope above a small dam. A tree was identified to the north of Wambo<br />

Site 347 (AS H) which showed evidence of wounding from lightning strike. It was considered by the<br />

registered Aboriginal parties present that the tree had not been culturally modified.<br />

One possible scar tree was identified in this area and was a narrow leaved red ironbark. Wambo Site 360<br />

(ST3) was located close to an extensive artefact scatter Wambo Site 57. The tree also shows evidence of<br />

mechanical wounding. The tree was located on a gentle slope and was situated close to the crest. A<br />

number of other artefact sites in addition to Wambo Site 57 may also have been associated with the scar<br />

tree including Wambo Sites 55, 348, 351, 356 and 58. These artefact sites were all situated in close<br />

proximity to the tree just below the crest of the hill.<br />

Survey Unit 4<br />

This survey unit encompassed the area that had been modified by a large dam. A large artefact scatter<br />

(Wambo Site 62) had been salvaged under Consent to Salvage Permit #2222 prior to the construction of the<br />

dam. The artefact scatter had been situated on the banks of an unnamed tributary of South Wambo Creek.<br />

The remainder of this survey unit was flood plain associated with South Wambo Creek. No Aboriginal<br />

cultural heritage sites were identified in this area.<br />

Survey Unit 5<br />

This survey unit was situated in the northernmost section of the project area and consisted of the southern<br />

bank of North Wambo Creek, the marshy flood plain areas between North Wambo Creek and Wollombi<br />

Brook and the slightly more elevated lower slopes above the dam in Survey Unit 4. Most of the area exhibits<br />

evidence of repeated periods of inundation in addition to disturbances by farming practices such as<br />

vegetation clearing and animal grazing, the installation of an electricity easement and the construction and<br />

use of access roads. It was considered that there was a low potential for subsurface artefacts to occur in this<br />

area.<br />

Two previously recorded sites were ground truthed during the survey work, Wambo Sites 98a (37-5-0186)<br />

and 98b (37-5-0187). Three new sites were also recorded, Wambo Site 359 (AS M), 361 (IF AA) and 362<br />

(AS AB). These new artefact sites were identified in areas of exposed, eroded soil and were likely to have<br />

washed down over time from further up slope.<br />

Survey Unit 6<br />

This survey unit was the southern corner of the project area and included a portion of Stony Creek<br />

immediately prior to its confluence with South Wambo Creek. The area includes the creek, creek banks and<br />

flood plain landforms.<br />

There were no previously registered AHIMS sites in this survey unit. One new artefact site was identified,<br />

Wambo Site 363 (AS AC). This artefact site was identified in the dry creek bed and it is considered that the<br />

artefacts may have been washed downstream during high rainfall periods.<br />

The project area was characterised by rolling hills to the north of the confluence of two creeks with extensive<br />

floodplains (Figure 1-1). Stony Creek is a tributary of South Wambo Creek. The floodplain at the confluence<br />

of these two creeks extends along both sides of the South Wambo Creek and along the western bank of<br />

Stony Creek. South Wambo Creek is in turn a tributary of Wollombi Brook which is situated to the east of the<br />

project area. The confluence of these two waterways is also outside of the immediate project area; however<br />

108453-2; October 2012 Page 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!