Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

Appendix C - Cultural Heritage Impact Assessment - Peabody Energy Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

peabodyenergy.com
from peabodyenergy.com More from this publisher
26.11.2014 Views

Cultural Heritage Impact Assessment North Wambo Underground Mine Modification Organisation Table 2 Aboriginal Parties who Registered their Interest Name of Representative Date of Registration Muswellbrook Cultural Consultants Brian Horton 26/05/2011 Upper Hunter Heritage Consultants Darryl & Melissa Matthews 26/05/2011 Hunter Valley Cultural Consultants Christine Archbold 26/05/2011 Mingga Consultants Clifford Matthews 26/05/2011 Valley Culture Larry Van Vliet 26/05/2011 Aboriginal Native Title Consultants John & Margaret Matthews 26/05/2011 Bullem Bullem Heritage Consultants Lloyd Matthews 26/05/2011 Hunter Valley Cultural Surveying Luke Hickey 26/05/2011 Carrawonga Consultants Justin Matthews 26/05/2011 Hunter Valley Natural & Cultural Resource Management David French 26/05/2011 Kayaway Eco-Cultural and Heritage Services Mark Hickey 26/05/2011 Upper Hunter Wonnarua Council Incorporated Victor & Rhoda Perry 26/05/2011 Wanaruah Custodians Aboriginal Corporation Reginald Eveleigh 26/05/2011 Giwirr Consultants Michele Stair 26/05/2011 Ungooroo Aboriginal Corporation Taasha Layer 26/05/2011 Wanaruah Local Aboriginal Land Council Noel Downs 30/05/2011 Yarrawalk Scott Franks 30/05/2011 Ungooroo Cultural & Community Services Rhonda Ward 30/05/2011 Wattaka Wonnarua Cultural Consultants Des Hickey 03/06/2011 Culturally Aware Tracey Skene 03/06/2011 HTO Environmental Management Services Paulette Ryan 05/06/2011 Lower Hunter Wonnarua Council Incorporated Thomas Miller 06/06/2011 Wonnarua Nation Aboriginal Corporation Laurie Perry 07/06/2011 Wonnarua Culture Heritage Shannon Griffiths 08/06/2011 Yinarr Cultural Services Kathleen Kinchela 10/06/2011 Widescope Indigenous Group Pty Ltd Amanda Hickey 14/06/2011 Buudang * Debbie Fowley 14/06/2011 Hunter Valley Aboriginal Corporation Ellaine Freihaut 14/06/2011 Wonn 1 Contracting Arthur Fletcher 15/06/2011 Gidawaa Walang Cultural Heritage Consultancy Ann Hickey 15/06/2011 Cacatua Culture Consultants Tegan McCormack 12/07/2011 * Previously known as Muronga Gialinga. Information regarding the proposed heritage assessment methodology and strategy for collecting information on cultural heritage significance was provided in writing to all registered Aboriginal parties groups on 16 June 2011. As part of the assessment methodology, copies of OEH site cards relevant to the project area were provided on disc and were taken onsite during the course of the survey works. 108453-2; October 2012 Page 9

Cultural Heritage Impact Assessment North Wambo Underground Mine Modification Six Aboriginal stakeholder groups provided comments on the methodology (Table 3). Cacatua Culture Consultants specified that they “...would like to have the opportunity to survey other areas that stakeholders feel might be potentially cultural significant within the survey area along with the field survey that is listed in the information supplied.” Wambo Coal responded by clarifying that the survey would be undertaken within the study area to the satisfaction of the Aboriginal Community Stakeholders. Yinaar Cultural Services agreed with the methodology. WLALC expressed their concerns regarding “mining disturbance within 2km of the Wollombi Brook area (whether it be open-cut or underground)” and the potential relationship of sites within the immediate project area to other sites beyond the spatial extent of the project area. They were also concerned about the potential impact on Aboriginal culture and heritage values with respect to the Bora Ground (AHIMS #37-6- 0056) located on the eastern side of Wollombi Brook approximately 2km to the south east of the eastern boundary of the project area, and approximately 3km from the Aboriginal cultural heritage sites identified in the project area. Wonnarua Culture Heritage expressed their support of the methodology “but would like to see the Groups involved in this project come together for a meeting to discuss the project”. The consult process for NWUMM is described in Section 2 of this report Wonnarua Nation Aboriginal Corporation expressed their support of the methodology but were concerned about protection of the Bora Ground and considered the area to be of “high Aboriginal Cultural Significance”. Yarrawalk were concerned about the proximity of the project area to the Bora Ground. The Bora Ground is located approximately 2km from the eastern boundary of the project area and will not be impacted by the NWUMM. Organisation Table 3 Registered Aboriginal parties responses to assessment methodology information Name of Representative Date of Comment Yarrawalk Scott Franks 24/06/2011 Wonnarua Culture Heritage Gordon & Shannon Griffiths 07/07/2011 Wonnarua Nation Aboriginal Corporation Laurie Perry 07/07/2011 Cacatua Culture Consultants Tegan McCormack 12/07/2011 Wanaruah Local Aboriginal Land Council Suzie Worth 18/07/2011 Yinarr Cultural Services Kathleen Kinchela 18/07/2011 Participation by Aboriginal stakeholders in the NWUMM field surveys occurred in accordance with the roster system established at the Wambo Mine on 12 February 2009. This roster system provides for the equitable distribution of fieldwork between the various Aboriginal community stakeholder groups registered for fieldwork at the Wambo Mine. It was determined that the next twelve groups in line on the roster would be invited out for the site inspection and would be divided into six groups per day. The twelve groups next in line were: Hunter Valley Aboriginal Corporation; Yinaar Cultural Services; Ungooroo Aboriginal Corporation; Giwiirr Consultants; Wonnarua Culture Heritage; Upper Hunter Wonnarua Council Incorporated; Ungooroo Cultural & Community Services; Wonnarua Elders Council; Wonn1 Contracting; Hunter Valley Cultural Surveying; WLALC; and HTO Environment Management Services. 108453-2; October 2012 Page 10

<strong>Cultural</strong> <strong>Heritage</strong> <strong>Impact</strong> <strong>Assessment</strong><br />

North Wambo Underground Mine Modification<br />

Organisation<br />

Table 2 Aboriginal Parties who Registered their Interest<br />

Name of Representative<br />

Date of<br />

Registration<br />

Muswellbrook <strong>Cultural</strong> Consultants Brian Horton 26/05/2011<br />

Upper Hunter <strong>Heritage</strong> Consultants Darryl & Melissa Matthews 26/05/2011<br />

Hunter Valley <strong>Cultural</strong> Consultants Christine Archbold 26/05/2011<br />

Mingga Consultants Clifford Matthews 26/05/2011<br />

Valley Culture Larry Van Vliet 26/05/2011<br />

Aboriginal Native Title Consultants John & Margaret Matthews 26/05/2011<br />

Bullem Bullem <strong>Heritage</strong> Consultants Lloyd Matthews 26/05/2011<br />

Hunter Valley <strong>Cultural</strong> Surveying Luke Hickey 26/05/2011<br />

Carrawonga Consultants Justin Matthews 26/05/2011<br />

Hunter Valley Natural & <strong>Cultural</strong> Resource<br />

Management<br />

David French 26/05/2011<br />

Kayaway Eco-<strong>Cultural</strong> and <strong>Heritage</strong> Services Mark Hickey 26/05/2011<br />

Upper Hunter Wonnarua Council Incorporated Victor & Rhoda Perry 26/05/2011<br />

Wanaruah Custodians Aboriginal Corporation Reginald Eveleigh 26/05/2011<br />

Giwirr Consultants Michele Stair 26/05/2011<br />

Ungooroo Aboriginal Corporation Taasha Layer 26/05/2011<br />

Wanaruah Local Aboriginal Land Council Noel Downs 30/05/2011<br />

Yarrawalk Scott Franks 30/05/2011<br />

Ungooroo <strong>Cultural</strong> & Community Services Rhonda Ward 30/05/2011<br />

Wattaka Wonnarua <strong>Cultural</strong> Consultants Des Hickey 03/06/2011<br />

<strong>Cultural</strong>ly Aware Tracey Skene 03/06/2011<br />

HTO Environmental Management Services Paulette Ryan 05/06/2011<br />

Lower Hunter Wonnarua Council Incorporated Thomas Miller 06/06/2011<br />

Wonnarua Nation Aboriginal Corporation Laurie Perry 07/06/2011<br />

Wonnarua Culture <strong>Heritage</strong> Shannon Griffiths 08/06/2011<br />

Yinarr <strong>Cultural</strong> Services Kathleen Kinchela 10/06/2011<br />

Widescope Indigenous Group Pty Ltd Amanda Hickey 14/06/2011<br />

Buudang * Debbie Fowley 14/06/2011<br />

Hunter Valley Aboriginal Corporation Ellaine Freihaut 14/06/2011<br />

Wonn 1 Contracting Arthur Fletcher 15/06/2011<br />

Gidawaa Walang <strong>Cultural</strong> <strong>Heritage</strong> Consultancy Ann Hickey 15/06/2011<br />

Cacatua Culture Consultants Tegan McCormack 12/07/2011<br />

*<br />

Previously known as Muronga Gialinga.<br />

Information regarding the proposed heritage assessment methodology and strategy for collecting information<br />

on cultural heritage significance was provided in writing to all registered Aboriginal parties groups on 16 June<br />

2011. As part of the assessment methodology, copies of OEH site cards relevant to the project area were<br />

provided on disc and were taken onsite during the course of the survey works.<br />

108453-2; October 2012 Page 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!