Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

Appendix C - Cultural Heritage Impact Assessment - Peabody Energy Appendix C - Cultural Heritage Impact Assessment - Peabody Energy

peabodyenergy.com
from peabodyenergy.com More from this publisher
26.11.2014 Views

Cultural Heritage Impact Assessment North Wambo Underground Mine Modification Aboriginal Cultural Heritage Recommendation 1 It is recommended that the artefacts remain in situ unless impact to the sites is unavoidable. It is further recommended that Wambo Coal undertakes subsidence monitoring to ensure impacts are as predicted. Recommendation 2 It is recommended that Wambo Coal seek an AHIP for the MA (excluding the portion covered by the existing Consent #2222) under Section 90 of the National Parks and Wildlife Act 1974 (NPW Act) to allow for subsidence and the salvage (if required) of registered and unregistered sites (should they be uncovered) in the MA; such works should be undertaken in consultation with the registered Aboriginal parties. If salvage is required, it is recommended that artefacts be transferred to the temporary keeping place under the existing Care and Control Permit (#3130) in consultation with the registered Aboriginal parties. Recommendation 3 The location of any Aboriginal cultural heritage sites in the project area should be included in the Wambo Coal environmental management framework for the project area, so that all relevant staff members are aware that these areas will require management. In General during the course of Wambo Coal Pty Ltd works Recommendation 4 If any previously unrecorded Aboriginal sites are identified during the course of surface works in the project area, the area should be cordoned off and surface works cease until the site has been adequately recorded. Any newly identified sites should be managed in accordance with management measures for similar site/artefact types previously identified within the project area or across the wider Wambo Mine area, in consultation with the registered Aboriginal parties. Recommendation 5 In the event that skeletal remains are uncovered, work must cease immediately in that area and Wambo Coal will need to contact the NSW Police Coroner to determine if the material is of Aboriginal origin. If determined to be Aboriginal, they must then contact the OEH Enviroline 131 555 and the registered Aboriginal parties in order to determine an action plan for the management of the skeletal remains prior to works re-commencing. Indigenous and non-Indigenous Cultural Heritage Recommendation 6 All relevant Wambo Coal staff should be made aware of their statutory obligations for heritage under NPW Act and the Heritage Act 1977, which may be implemented as a heritage induction. If during the course of surface site works significant European cultural heritage material is uncovered, surface work should cease in that area immediately. OEH should be notified and works only recommenced when an appropriate and approved management strategy has been instigated. 108453-2; October 2012 ES- 4

Cultural Heritage Impact Assessment North Wambo Underground Mine Modification Terms and Abbreviations Abbreviation ACHCRs AHIMS AHIP BP cal. years BP CHIA DA DGPS DECCW EA EPRG EIA EIS EoI LEP MA MOL NSW NWUM NWUMM OEH PAD ROM SHR SU Wambo Coal WLALC WMCLB Description Aboriginal Cultural Heritage Consultation Requirements for Proponents (2010) were released by DECCW on 12 April, 2010. These consultation requirements are triggered for assessments under Part 3A for the EP&A Act, or if an AHIP is required under part 4 or 5 of the EP&A Act, or if archaeological investigations are required in accordance with the Code of Practice for Archaeological Investigation of Aboriginal Objects in New South Wales (2010). Aboriginal Heritage Information Management System Aboriginal Heritage Impact Permit Before present (as in years before present) Calibrated years before present, indicates a radiocarbon date has been calibrated using the dendochronology curves, making the date more accurate than an uncalibrated date Cultural Heritage Impact Assessment Development Application Differential Global Positioning System Department of Environment, Climate Change and Water Environmental Assessment Environment Protection Regulation Group Environmental Impact Assessment Environmental Impact Statement Expression of Interest Local Environment Plan Modification Area Mine Owned Land New South Wales North Wambo Underground Mine North Wambo Underground Mine Modification Office of Heritage and Environment Potential Archaeological Deposit Run of Mine State Heritage Register Survey Unit Wambo Coal Pty Ltd Wanaruah Local Aboriginal Land Council Wambo Mining and Coal Lease Boundary 108453-2; October 2012 ES- 5

<strong>Cultural</strong> <strong>Heritage</strong> <strong>Impact</strong> <strong>Assessment</strong><br />

North Wambo Underground Mine Modification<br />

Terms and Abbreviations<br />

Abbreviation<br />

ACHCRs<br />

AHIMS<br />

AHIP<br />

BP<br />

cal. years BP<br />

CHIA<br />

DA<br />

DGPS<br />

DECCW<br />

EA<br />

EPRG<br />

EIA<br />

EIS<br />

EoI<br />

LEP<br />

MA<br />

MOL<br />

NSW<br />

NWUM<br />

NWUMM<br />

OEH<br />

PAD<br />

ROM<br />

SHR<br />

SU<br />

Wambo Coal<br />

WLALC<br />

WMCLB<br />

Description<br />

Aboriginal <strong>Cultural</strong> <strong>Heritage</strong> Consultation Requirements for Proponents (2010) were<br />

released by DECCW on 12 April, 2010. These consultation requirements are triggered for<br />

assessments under Part 3A for the EP&A Act, or if an AHIP is required under part 4 or 5 of<br />

the EP&A Act, or if archaeological investigations are required in accordance with the Code<br />

of Practice for Archaeological Investigation of Aboriginal Objects in New South Wales<br />

(2010).<br />

Aboriginal <strong>Heritage</strong> Information Management System<br />

Aboriginal <strong>Heritage</strong> <strong>Impact</strong> Permit<br />

Before present (as in years before present)<br />

Calibrated years before present, indicates a radiocarbon date has been calibrated using the<br />

dendochronology curves, making the date more accurate than an uncalibrated date<br />

<strong>Cultural</strong> <strong>Heritage</strong> <strong>Impact</strong> <strong>Assessment</strong><br />

Development Application<br />

Differential Global Positioning System<br />

Department of Environment, Climate Change and Water<br />

Environmental <strong>Assessment</strong><br />

Environment Protection Regulation Group<br />

Environmental <strong>Impact</strong> <strong>Assessment</strong><br />

Environmental <strong>Impact</strong> Statement<br />

Expression of Interest<br />

Local Environment Plan<br />

Modification Area<br />

Mine Owned Land<br />

New South Wales<br />

North Wambo Underground Mine<br />

North Wambo Underground Mine Modification<br />

Office of <strong>Heritage</strong> and Environment<br />

Potential Archaeological Deposit<br />

Run of Mine<br />

State <strong>Heritage</strong> Register<br />

Survey Unit<br />

Wambo Coal Pty Ltd<br />

Wanaruah Local Aboriginal Land Council<br />

Wambo Mining and Coal Lease Boundary<br />

108453-2; October 2012 ES- 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!