25.11.2014 Views

A1P (1) MAJOR HIGHWAY SCHEMES - A5225 ... - Wigan Council

A1P (1) MAJOR HIGHWAY SCHEMES - A5225 ... - Wigan Council

A1P (1) MAJOR HIGHWAY SCHEMES - A5225 ... - Wigan Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>A1P</strong> (2A) WESTWOOD PARK LINK ROAD<br />

Objections to Draft Deposit<br />

Ref No a b c d Name Agent Response Ref.<br />

419 O 002 A 1P Delmo Services Ltd WMBC 419 <strong>A1P</strong><br />

Objections to Revised Deposit<br />

Ref No a b c d Name Agent Response Ref.<br />

419 O 004 A 1P Delmo Services Ltd WMBC 419 <strong>A1P</strong><br />

Main Issue<br />

Whether this policy is appropriate, having regard to the effect of the scheme on the safe<br />

and free flow of traffic.<br />

Inspector’s Considerations and Conclusions<br />

10.136 The Westwood Park Link Road is the first phase of the road scheme which<br />

will link the <strong>Wigan</strong> town centre with Westwood Park and the proposed <strong>A5225</strong> <strong>Wigan</strong> and<br />

Hindley Bypass. An objector argues that the detailed design of this road would disrupt<br />

activities at his site, because vehicles entering and leaving would be restricted to a left<br />

turn and there would be increased congestion of the local highway network. He suggests<br />

detailed changes to the layout of the proposed road.<br />

10.137 This objection relates to a level of detail which is inappropriate to the<br />

development plan stage. It is a matter for consideration when a detailed scheme is<br />

formulated and submitted for planning permission. This process has already been<br />

undertaken and the relevant planning application was approved in September 2002. A<br />

Compulsory Purchase Order to support the implementation of the scheme was confirmed<br />

in September 2004. This objection has, therefore, been overtaken by events. In respect of<br />

the objector’s specific concerns a Transport Assessment undertaken to support the<br />

relevant planning application confirmed that the highway network will operate<br />

satisfactorily when the scheme is implemented.<br />

Recommendation<br />

I recommend:<br />

(REC 10.20) that no modification be made to the RDD in response to these<br />

objections.<br />

423

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!