Jabi<strong>the</strong>rm<br />

Rohrsysteme AG<br />

Brügger Str. 6<br />

53842 Troisdorf<br />

Mounting instruction<br />

The <strong>piping</strong> are stocked on wide studding<br />

(pipeend) or on wooden pallet (insulation).<br />

Piping is delivered in normal stock length.<br />

Insulation ends app. 200 mm at <strong>the</strong> end <strong>of</strong><br />

<strong>the</strong> carrier pipe.<br />

Adapting pieces are cut with a saw or a<br />

metal slitting machine. For welding purposes<br />

<strong>the</strong> insulation is cut app. 200 mm at<br />

<strong>the</strong> end <strong>of</strong> <strong>the</strong> carrier pipe.<br />

Bends, T-pieces and o<strong>the</strong>r inserts are made<br />

with not <strong>insulated</strong> carrier pipe. The insulation<br />

is normally made on site.<br />

The expanding tendency is <strong>the</strong> same as to<br />

not <strong>insulated</strong> <strong>piping</strong>.<br />

The supporting length is according to <strong>the</strong><br />

rules for not <strong>insulated</strong> <strong>piping</strong> to calculate.<br />

The weight <strong>of</strong> <strong>the</strong> insulation is carried by<br />

<strong>the</strong> protecting jacket.<br />

The supports are fixed at <strong>the</strong> outer casing.<br />

The whole system moves as one unit. The<br />

system manages <strong>the</strong> normal forces out <strong>of</strong><br />

<strong>the</strong> resistance <strong>of</strong> <strong>the</strong> sliding supports.<br />

Fix points are normally fixed to <strong>the</strong> carrier<br />

pipe but could also be fixing at <strong>the</strong> outer<br />

casing (<strong>must</strong> comply with max. bonding<br />

force).<br />

02241 95350 �<br />

02241 47871 FAX<br />

Montagehinweise<br />

Rohre werden auf breiten Kanthölzern (am<br />

Rohrende) oder Holz-Paletten (auf dem<br />

Isoliermantel) gelagert.<br />

Rohrlieferlängen sind Standardrohrlängen<br />

des Mediumrohres.<br />

Die Isolierenden betragen in der Regel ca.<br />

200 mm.<br />

Paßstücke werden mittels Trennscheibe<br />

oder Säge von den Lieferlängen abgeschnitten.<br />

Für die Verbindungstechnik wird<br />

die Isolierung nach Erfordernis abgetrennt.<br />

Bögen, T-Stücke oder andere Fittings<br />

werden in unisolierten Mediumrohr erstellt.<br />

Die Isolierung erfolgt in der Regel vor Ort.<br />

Das Ausdehnungsverhalten von vorisolierten<br />

Rohrleitungen entspricht dem von<br />

unisolierten Rohrleitungen.<br />

Bei der Berechnung von Stützweiten ist von<br />

den Berechnungsregeln für unisolierte<br />

Rohrleitungen auszugehen, das Isoliergewicht<br />

wird durch den Wickelfalzmantel<br />

getragen.<br />

Halterungen werden am Außenmantel befestigt.<br />

Der gesamte Isolierverbund bewegt<br />

sich als Einheit und ist in der Lage die<br />

üblichen Kräfte zu übertragen.<br />

Festpunkte werden in der Regel am<br />

Mediumrohr befestigt, können jedoch auch<br />

bei Einhaltung der angegebenen<br />

Scherkräfte am Außenmantel befestigt<br />

werden.<br />