Barrack Street to King Street<br />

Barrack Street intersection<br />

Erskine Street to Barrack Street<br />

Ref<br />

(refer<br />

Fig 3-4<br />

to 3-9)<br />

F<br />

Proposal description<br />

Alter the parking provisions on the<br />

eastern kerb:<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions.<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

Alter the parking provisions on the<br />

western kerb:<br />

<br />

<br />

<br />

Provide full time bus zone<br />

Provide loading zone in the<br />

morning and inter peak periods<br />

and Saturday mornings<br />

Retain mail zone.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

<br />

Relocate the bus lane from the<br />

western kerb northbound lane to<br />

the adjacent lane.<br />

Supporting work:<br />

<br />

Line markings and apply red painted<br />

surface coating<br />

<br />

Regrade and resurface<br />

G<br />

<br />

Remove the two kerb extensions<br />

located on the eastern kerb to<br />

create an additional lane through<br />

the intersection.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Traffic signal relocation<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Replace existing drainage pits<br />

<br />

Reinstate existing gutters<br />

<br />

Relocate the existing junction box and<br />

telephone box<br />

H<br />

<br />

<br />

Remove the mid-block kerb<br />

extension located on the eastern<br />

kerb in front <strong>of</strong> Clarence Street<br />

Cyclery<br />

Relocate the cycle parking<br />

provisions to Barrack Street<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Footpath alterations<br />

<br />

Create an additional northbound<br />

lane to allow the relocation <strong>of</strong> the<br />

bus lane from western kerb to<br />

adjacent lane.<br />

<br />

<br />

<br />

Traffic signal relocation<br />

Localised resurfacing<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Modify existing gutter<br />

<br />

Remove parking meter<br />

<br />

Relocate existing bicycle racks<br />

Alter the parking provisions on the<br />

eastern kerb:<br />

<br />

<br />

Lengthen the extent <strong>of</strong> full time ‘no<br />

stopping’ restrictions on the<br />

approach to Barrack Street<br />

Remove motorcycle parking.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Signage relocation<br />

Lane marking alterations<br />

Sydney City Centre Capa<strong>city</strong> Improvement 77<br />