24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Pitt Street to Castlereagh Street<br />

George Street to Pitt Street<br />

York Street to George Street<br />

Ref<br />

(refer<br />

Fig 3-4<br />

to 3-9)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

F<br />

<br />

Reduce the northern kerb footpath<br />

to improve road geometry and<br />

traffic capa<strong>city</strong>.<br />

Type No. 3: Footpath width alterations:<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

<br />

Footpath alterations<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Relocate existing drainage pit and inlet<br />

<br />

Extend existing drainage downpipes<br />

<br />

Install new drainage gutters<br />

<br />

Modify existing drainage pits<br />

<br />

Remove the three existing Simons<br />

Poplar trees along the northern<br />

footpath<br />

<br />

Relocate the phone booth<br />

G<br />

George Street intersection: No change<br />

H<br />

Alter the parking provisions on the<br />

southern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Relocate the existing coach<br />

parking on the southern kerb to<br />

the western kerb on Pitt Street<br />

Remove a section (18-20 m) <strong>of</strong> the<br />

loading zone in Pitt Street to<br />

accommodate coach parking<br />

relocated from Market Street<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions on southern kerb <strong>of</strong><br />

Market Street (affecting authorised<br />

parking and taxi provisions).<br />

Alter the parking provisions on the<br />

northern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Increase the length <strong>of</strong> ‘no parking’<br />

adjacent to Swissotel<br />

Create a morning peak period<br />

loading zone from Monday to<br />

Saturday and taxi zone for the rest<br />

<strong>of</strong> the day (affecting motorcycle<br />

parking).<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

I<br />

Pitt Street intersection: No change<br />

J<br />

Alter bus zone, loading zone and taxi<br />

rank provisions on the southern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

Introduce ‘no stopping’ restrictions<br />

during weekday morning, inter and<br />

afternoon peak periods and create<br />

a taxi zone at other times<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

<br />

Remove loading zones that<br />

currently operate during the<br />

weekday inter peak period and the<br />

taxi zone that currently operates<br />

during the weekday inter and<br />

afternoon peak periods.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 74<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!