York Street intersection Clarence Street to York Street Ref (refer Fig 3-4 to 3-9) C Proposal description Clarence Street intersection: Refer to R4(K) Type of capacity improvement and associated work (refer Table 3-2) D Reduce the width of the northern footpath Maintain existing bus layover and eastern mail zone provisions, whilst providing an additional westbound through lane Type No. 3: Footpath width alterations: Temporary traffic management Temporary footpath restrictions/closure Kerb/kerb ramp relocation Footpath alterations Remove western mail zone and postal boxes. Localised resurfacing Lane marking alterations Supporting work: Relocate existing drainage pit and inlet Extend existing drainage buildings downpipes Relocate drainage gutters Modify existing drainage pits Relocate/remove the existing post boxes Relocate the existing lighting poles Potential work within root zone of London Plane tree/s E Remove the north-east kerb extension on York Street immediately north of the intersection. Type No. 2: Kerb extension alterations: Temporary traffic management Temporary footpath restrictions/closure Kerb/kerb ramp relocation Footpath alterations Signage relocation Traffic signal relocation Localised resurfacing Lane marking alterations Supporting work: Relocate existing drainage pit and inlet Slightly modify the south-east kerb between York Street immediately south of the intersection. Type No. 2: Kerb extension alterations: Temporary traffic management Temporary footpath restrictions/closure Kerb/kerb ramp relocation Footpath alterations Signage relocation Traffic signal relocation Localised resurfacing Lane marking alterations Supporting work: Relocate existing pits Reinstate the drainage gutter Relocate existing bin on York Street Sydney City Centre Capacity Improvement 73 Review of Environmental Factors
Pitt Street to Castlereagh Street George Street to Pitt Street York Street to George Street Ref (refer Fig 3-4 to 3-9) Proposal description Type of capacity improvement and associated work (refer Table 3-2) F Reduce the northern kerb footpath to improve road geometry and traffic capacity. Type No. 3: Footpath width alterations: Temporary traffic management Temporary footpath restrictions/closure Footpath alterations Localised resurfacing Lane marking alterations Supporting work: Relocate existing drainage pit and inlet Extend existing drainage downpipes Install new drainage gutters Modify existing drainage pits Remove the three existing Simons Poplar trees along the northern footpath Relocate the phone booth G George Street intersection: No change H Alter the parking provisions on the southern kerb: Type No. 5: Kerbside allocation modifications: Relocate the existing coach parking on the southern kerb to the western kerb on Pitt Street Remove a section (18-20 m) of the loading zone in Pitt Street to accommodate coach parking relocated from Market Street Temporary traffic management Signage relocation Lane marking alterations Introduce full time ‘no stopping’ restrictions on southern kerb of Market Street (affecting authorised parking and taxi provisions). Alter the parking provisions on the northern kerb: Type No. 5: Kerbside allocation modifications: Increase the length of ‘no parking’ adjacent to Swissotel Create a morning peak period loading zone from Monday to Saturday and taxi zone for the rest of the day (affecting motorcycle parking). Temporary traffic management Signage relocation Lane marking alterations I Pitt Street intersection: No change J Alter bus zone, loading zone and taxi rank provisions on the southern kerb: Type No. 5: Kerbside allocation modifications: Introduce ‘no stopping’ restrictions during weekday morning, inter and afternoon peak periods and create a taxi zone at other times Temporary traffic management Signage relocation Lane marking alterations Remove loading zones that currently operate during the weekday inter peak period and the taxi zone that currently operates during the weekday inter and afternoon peak periods. Sydney City Centre Capacity Improvement 74 Review of Environmental Factors
- Page 39 and 40: 2.4.2 Identified proposal options P
- Page 41 and 42: Precinct 2: retail Precinct 2: reta
- Page 43 and 44: Sydney City Centre Capacity Improve
- Page 45 and 46: Precinct 3: southern Precinct 3: so
- Page 47 and 48: Sydney City Centre Capacity Improve
- Page 49 and 50: Precinct 4: college Precinct 4: col
- Page 51 and 52: Sydney City Centre Capacity Improve
- Page 53 and 54: NW2: King Street (two options) Traf
- Page 55 and 56: Amenity All three options reallocat
- Page 57 and 58: Amenity At present, buses cannot re
- Page 59 and 60: Summary Table 2-6 ‘Option b’ an
- Page 61 and 62: Amenity Kerbside use Business impac
- Page 63 and 64: Table 2-7 Analysis of options in pr
- Page 65 and 66: Amenity Kerbside use Business impac
- Page 67 and 68: 3 Description of the proposal The p
- Page 69 and 70: Work site reference Section Start a
- Page 71 and 72: Table 3-2 Typical traffic capacity
- Page 73 and 74: Typical improvement (with example)
- Page 75 and 76: Typical improvement (with example)
- Page 77 and 78: Typical improvement (with example)
- Page 79 and 80: Sussex Street to Kent Street Sussex
- Page 81 and 82: George Street to Pitt Street York S
- Page 83 and 84: Sydney City Centre Capacity Improve
- Page 85 and 86: Sydney City Centre Capacity Improve
- Page 87 and 88: Sydney City Centre Capacity Improve
- Page 89: Kent Street intersection Pitt Stree
- Page 93 and 94: Margaret Street to Erskine Street J
- Page 95 and 96: Market Street intersection King Str
- Page 97 and 98: Sydney City Centre Capacity Improve
- Page 99 and 100: Sydney City Centre Capacity Improve
- Page 101 and 102: Sydney City Centre Capacity Improve
- Page 103 and 104: Sydney City Centre Capacity Improve
- Page 105 and 106: Sydney City Centre Capacity Improve
- Page 107 and 108: Sydney City Centre Capacity Improve
- Page 109 and 110: Liverpool Street to Eager Lane Jame
- Page 111 and 112: Hay Street to Rawson Place Goulburn
- Page 113 and 114: Abercrombie Street intersection Ref
- Page 115 and 116: Ref (refer Fig 3-10 to 3-16) Propos
- Page 117 and 118: Sydney City Centre Capacity Improve
- Page 119 and 120: Sydney City Centre Capacity Improve
- Page 121 and 122: Sydney City Centre Capacity Improve
- Page 123 and 124: Sydney City Centre Capacity Improve
- Page 125 and 126: Sydney City Centre Capacity Improve
- Page 127 and 128: Wemyss Lane to Goulburn Street Ref
- Page 129 and 130: Macquarie Street intersection Campb
- Page 131 and 132: Park Street to Oxford Street Prince
- Page 133 and 134: Sydney City Centre Capacity Improve
- Page 135 and 136: Sydney City Centre Capacity Improve
- Page 137 and 138: Sydney City Centre Capacity Improve
- Page 139 and 140: Sydney City Centre Capacity Improve
York Street intersection<br />
Clarence Street to York Street<br />
Ref<br />
(refer<br />
Fig 3-4<br />
to 3-9)<br />
C<br />
Proposal description<br />
Clarence Street intersection: Refer to R4(K)<br />
Type <strong>of</strong> capa<strong>city</strong> improvement and<br />
associated work (refer Table 3-2)<br />
D<br />
<br />
<br />
Reduce the width <strong>of</strong> the northern<br />
footpath<br />
Maintain existing bus layover and<br />
eastern mail zone provisions,<br />
whilst providing an additional<br />
westbound through lane<br />
Type No. 3: Footpath width alterations:<br />
<br />
<br />
<br />
<br />
Temporary traffic management<br />
Temporary footpath restrictions/closure<br />
Kerb/kerb ramp relocation<br />
Footpath alterations<br />
<br />
Remove western mail zone and<br />
postal boxes.<br />
<br />
<br />
Localised resurfacing<br />
Lane marking alterations<br />
Supporting work:<br />
<br />
Relocate existing drainage pit and inlet<br />
<br />
Extend existing drainage buildings<br />
downpipes<br />
<br />
Relocate drainage gutters<br />
<br />
Modify existing drainage pits<br />
<br />
Relocate/remove the existing post<br />
boxes<br />
<br />
Relocate the existing lighting poles<br />
<br />
Potential work within root zone <strong>of</strong><br />
London Plane tree/s<br />
E<br />
<br />
Remove the north-east kerb<br />
extension on York Street<br />
immediately north <strong>of</strong> the<br />
intersection.<br />
Type No. 2: Kerb extension alterations:<br />
<br />
<br />
<br />
Temporary traffic management<br />
Temporary footpath restrictions/closure<br />
Kerb/kerb ramp relocation<br />
<br />
Footpath alterations<br />
<br />
Signage relocation<br />
<br />
Traffic signal relocation<br />
<br />
Localised resurfacing<br />
<br />
Lane marking alterations<br />
Supporting work:<br />
<br />
Relocate existing drainage pit and inlet<br />
<br />
Slightly modify the south-east kerb<br />
between York Street immediately<br />
south <strong>of</strong> the intersection.<br />
Type No. 2: Kerb extension alterations:<br />
<br />
<br />
Temporary traffic management<br />
Temporary footpath restrictions/closure<br />
<br />
Kerb/kerb ramp relocation<br />
<br />
Footpath alterations<br />
<br />
Signage relocation<br />
<br />
Traffic signal relocation<br />
<br />
Localised resurfacing<br />
<br />
Lane marking alterations<br />
Supporting work:<br />
<br />
Relocate existing pits<br />
<br />
Reinstate the drainage gutter<br />
<br />
Relocate existing bin on York Street<br />
Sydney City Centre Capa<strong>city</strong> Improvement 73<br />