24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

George Street to Pitt Street<br />

York Street to George Street<br />

Ref<br />

(refer<br />

Fig 3-1<br />

to 3-3)<br />

H<br />

Proposal description<br />

Remove parking on the southern kerb:<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions (affecting existing<br />

weekday evening and weekend<br />

loading and parking provisions)<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

Supporting work:<br />

<br />

<br />

<br />

<br />

Modify existing drainage pits<br />

Relocate existing telephone booth<br />

Road alignment brought marginally<br />

closer to the existing awnings<br />

Relocate the <strong>city</strong> map sign<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Remove the parking ticket vending<br />

machine<br />

<br />

<br />

Undertake minor alterations to the<br />

line marking to improve the<br />

geometry between intersections<br />

Regrade and resurface the full<br />

road width<br />

Type No. 6: Lane arrangements<br />

Signage relocation<br />

Lane marking alterations<br />

Supporting work:<br />

Regrade and resurface<br />

I<br />

George Street intersection: No change<br />

J<br />

<br />

Reduce the length <strong>of</strong> the mid-block<br />

southern kerb extension on King<br />

Street to the east and west <strong>of</strong> the<br />

mid-block signal crossing<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Signage relocation<br />

<br />

Traffic signal relocation<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Relocate existing stormwater drainage<br />

inlet pits<br />

<br />

Relocate 10 bollards, three sign posts,<br />

three bicycle racks and four flagpoles<br />

<br />

Relocate lighting poles<br />

Alter the parking provisions on the<br />

southern kerb:<br />

<br />

<br />

Create a full time taxi zone<br />

between George Street and the<br />

modified mid-block kerb<br />

Create a loading zone in the<br />

weekday morning and inter peak<br />

periods and Saturday morning<br />

peak period between the modified<br />

mid-block kerb and Pitt Street<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

K<br />

Pitt Street intersection: No changes<br />

Sydney City Centre Capa<strong>city</strong> Improvement 64<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!