24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

York Street intersection<br />

Clarence Street to York Street<br />

Clarence Street intersection<br />

Kent Street to Clarence Street<br />

Ref<br />

(refer<br />

Fig 3-1<br />

to 3-3)<br />

D<br />

Proposal description<br />

Remove parking on the southern kerb:<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions (affecting existing<br />

weekday evening and weekend<br />

parking provisions)<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

Supporting work:<br />

Remove the parking ticket vending<br />

machine<br />

E<br />

<br />

Remove the kerb extension on the<br />

eastern kerb on Clarence Street<br />

immediately north <strong>of</strong> the<br />

intersection<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Signage relocation<br />

<br />

Traffic signal relocation<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Modify existing drainage pits Relocate<br />

the street lighting pole<br />

<br />

Relocate the water fountain<br />

<br />

Relocate the rubbish bin<br />

F<br />

Remove parking on the northern kerb:<br />

<br />

Introduce full time ‘no stopping’<br />

restrictions (affecting existing inter<br />

peak loading zones, weekday<br />

evening and weekend parking<br />

provisions)<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Remove the parking ticket vending<br />

machine<br />

G<br />

<br />

Change the line marking to<br />

improve the geometry at the<br />

intersections<br />

Type No. 1: Intersection reconfiguration<br />

and geometry modifications:<br />

<br />

Line marking alterations<br />

<br />

<br />

Minor reduction to the kerb<br />

extension on the western kerb <strong>of</strong><br />

York Street immediately south <strong>of</strong><br />

the intersection<br />

Widen the pedestrian crossing in<br />

York Street on the southern side <strong>of</strong><br />

the intersection<br />

Type No. 2: Kerb extension alterations:<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Footpath alterations<br />

Signage relocation<br />

Traffic signal relocation<br />

Localised resurfacing<br />

Lane marking alterations<br />

Sydney City Centre Capa<strong>city</strong> Improvement 63<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!