effects summarised in Table S-2 are all operational outcomes; however the adverse<br />

effects summarised in Table S-3 include both construction phase and operational<br />

phase impacts, as indicated in the table.<br />

Table S-2<br />

Summary <strong>of</strong> beneficial effects (during operation <strong>of</strong> the proposal)<br />

Benefit<br />

Affected<br />

<strong>factors</strong>/receivers<br />

Location<br />

(also refer Figure 1-1)<br />

Traffic, transport and access benefits<br />

Reallocation and reprioritisation <strong>of</strong><br />

traffic on certain roads to support<br />

changes introduced under the<br />

Access Strategy<br />

Maintenance <strong>of</strong> road network<br />

performance in the future at key<br />

congested ‘pinch points’ and<br />

intersections<br />

Setting priorities, removing conflict<br />

and improving circulation on key<br />

primary and secondary bus route<br />

corridors in the <strong>city</strong> <strong>centre</strong> to<br />

support peak period demand and<br />

movement<br />

Creation or widening <strong>of</strong> footpaths<br />

or kerbs or the installation <strong>of</strong><br />

pedestrian crossings<br />

Socioeconomic benefits<br />

Creation or extension <strong>of</strong> kerbs<br />

and footpaths with minor benefits<br />

for pedestrian safety and capa<strong>city</strong><br />

Improvements in traffic<br />

connectivity and movement<br />

through introduction <strong>of</strong> additional<br />

capa<strong>city</strong> along roads and<br />

intersections<br />

Road users<br />

Businesses and<br />

deliveries<br />

Road users<br />

Businesses and<br />

deliveries<br />

Bus prioritisation<br />

Public transport<br />

patrons<br />

The entire proposal<br />

footprint and <strong>city</strong> <strong>centre</strong><br />

The entire proposal<br />

footprint and <strong>city</strong> <strong>centre</strong><br />

The entire proposal<br />

footprint and <strong>city</strong> <strong>centre</strong><br />

Pedestrians Work sites: NW2, R2,<br />

R4, S4 and S5<br />

Pedestrians Work sites: NW2, R2,<br />

R4, S4 and S5<br />

Road users<br />

Businesses and<br />

deliveries<br />

The entire proposal<br />

footprint and <strong>city</strong> <strong>centre</strong><br />

Table S-3<br />

Summary <strong>of</strong> adverse effects (during construction and operation <strong>of</strong> the<br />

proposal)<br />

Effect<br />

Affected<br />

<strong>factors</strong>/receivers<br />

Location<br />

(also refer Figure 1-1)<br />

Traffic, transport and access – construction<br />

Temporary footpath and cycleway<br />

restrictions as well as traffic<br />

management controls<br />

Temporary loss <strong>of</strong> access at up to<br />

15 bus stops due to adjacent<br />

footpath and lane restrictions<br />

Sydney City Centre Capa<strong>city</strong> Improvement Plan<br />

Review <strong>of</strong> Environmental Factors<br />

Pedestrians<br />

Cyclists<br />

Public transport<br />

patrons<br />

Work sites: NW1, NW2,<br />

R1, R2, R4, R5, S2, S4,<br />

S5, S6, C1, C2 and F1<br />

Work sites: NW2, R2,<br />

R4, R5, S3 and C2<br />