Work site Option Proposal overview R5: York Street B Improve bus operations on York Street between Barrack Street and Druitt Street by removing kerb extensions. Precinct 3: southern S1: Sussex Street A Introduce morning and evening peak hour parking restrictions adjacent to the western kerb of Sussex Street on the approach to Goulburn Street and Liverpool Street. Introduce evening peak hour parking restrictions adjacent to the eastern kerb on the approach to Goulbourn Street. S2: Goulburn Street A Modify the existing kerb extension on the south-east corner of Goulbourn Street and George Street to provide three through lanes on the approach to George Street. S3: Pitt Street A Modify lane arrangements and introduce morning and evening peak period parking restrictions to introduce northbound and southbound capacity between Goulburn Street and Campbell Street. S4: Ultimo Road A Modify lane arrangements to provide a dual-left turn into Harris Street from Ultimo Road. S5: Broadway A Modify lane arrangements in Broadway (city bound) and on Wattle Street to encourage use of Wattle Street for access to the city centre and city north areas. S6: Pitt Street A Modify lane arrangements to set priorities between Pitt Street, George Street and Quay Street. Precinct 4: college C1: Wentworth Avenue A Maximise the use of the 21-metre wide carriageway to provide an additional northbound and southbound lane over much of the length of the corridor whilst improving the turning movements at both Goulburn Street and Oxford Street. C2: College Street A Create additional lengths for left and right turns on both of the approaches to Park Street, whilst also modifying the road geometry at the northern end of College Street and on Prince Albert Road to introduce capacity for the traffic approaching Macquarie Street. Modify the lane arrangements between Macquarie Street and College Street to introduce northbound capacity. Precinct 5: financial F1: Macquarie Street A Introduce northbound capacity in the morning and evening peak periods on the approach to Bridge Street. F1: Macquarie Street A Remove right turn bay on Macquarie Street on the approach to Hunter Street in order to increase right turn capacity for motorists accessing Shakespeare Place and the Eastern Distributor. Chapter 3 describes the key features of the preferred option (the proposal). Sydney City Centre Capacity Improvement 49 Review of Environmental Factors
3 Description of the proposal The proposal is described in this chapter. 3.1 The proposal 3.1.1 Proposal footprint The proposal comprises traffic capacity improvement work at 17 locations across the city centre, which combine to form the proposal footprint. Figure 1-1 shows the proposal footprint. Figure 3-1 to Figure 3-22 show the extent of the proposed work in each of the 17 locations and the detail of the improvements that would be implemented. Table 3-1 provides an overview of the five precincts and 17 work sites. The start and end point for each work site has been identified by a major intersection for ease of reference. The work sites have been broken down into sections, as detailed in Table 3-1. Work would not take place in all sections, as shown in Table 3-3. Table 3-1 Overview of precincts, work sites and road sections Work site reference Section Start and end point Precinct 1: north-west A Margaret Street intersection B Margaret Street to Erskine Street NW1 Kent Street C Erskine Street intersection D Erskine Street to King Street E King Street intersection A Sussex Street intersection B Sussex Street to Kent Street C Kent Street intersection D Kent Street to Clarence Street E Clarence Street intersection F Clarence Street to York Street NW2 King Street G York Street intersection H York Street to George Street I George Street intersection J George Street to Pitt Street K Pitt Street intersection L Pitt Street to Castlereagh Street M Castlereagh Street intersection Precinct 2: retail R1 Park Street A Pitt Street intersection A Kent Street intersection R2 Market Street B Kent Street to Clarence Street Sydney City Centre Capacity Improvement 50 Review of Environmental Factors
- Page 15 and 16: What happens next? Following the su
- Page 17 and 18: 6.7 Water quality and hydrology ...
- Page 19 and 20: If approved, the proposal would tak
- Page 21 and 22: Sydney City Centre Capacity Improve
- Page 23 and 24: In doing so, the REF helps fulfil t
- Page 25 and 26: 2 Need and options considered This
- Page 27 and 28: NSW Long Term Transport Master Plan
- Page 29 and 30: 2.2 Existing road and public transp
- Page 31 and 32: Road Sussex Street between King Str
- Page 33 and 34: Road Precinct 4: college Wentworth
- Page 35 and 36: Bus stop hubs located at Circular Q
- Page 37 and 38: With these allocations set, Transpo
- Page 39 and 40: 2.4.2 Identified proposal options P
- Page 41 and 42: Precinct 2: retail Precinct 2: reta
- Page 43 and 44: Sydney City Centre Capacity Improve
- Page 45 and 46: Precinct 3: southern Precinct 3: so
- Page 47 and 48: Sydney City Centre Capacity Improve
- Page 49 and 50: Precinct 4: college Precinct 4: col
- Page 51 and 52: Sydney City Centre Capacity Improve
- Page 53 and 54: NW2: King Street (two options) Traf
- Page 55 and 56: Amenity All three options reallocat
- Page 57 and 58: Amenity At present, buses cannot re
- Page 59 and 60: Summary Table 2-6 ‘Option b’ an
- Page 61 and 62: Amenity Kerbside use Business impac
- Page 63 and 64: Table 2-7 Analysis of options in pr
- Page 65: Amenity Kerbside use Business impac
- Page 69 and 70: Work site reference Section Start a
- Page 71 and 72: Table 3-2 Typical traffic capacity
- Page 73 and 74: Typical improvement (with example)
- Page 75 and 76: Typical improvement (with example)
- Page 77 and 78: Typical improvement (with example)
- Page 79 and 80: Sussex Street to Kent Street Sussex
- Page 81 and 82: George Street to Pitt Street York S
- Page 83 and 84: Sydney City Centre Capacity Improve
- Page 85 and 86: Sydney City Centre Capacity Improve
- Page 87 and 88: Sydney City Centre Capacity Improve
- Page 89 and 90: Kent Street intersection Pitt Stree
- Page 91 and 92: Pitt Street to Castlereagh Street G
- Page 93 and 94: Margaret Street to Erskine Street J
- Page 95 and 96: Market Street intersection King Str
- Page 97 and 98: Sydney City Centre Capacity Improve
- Page 99 and 100: Sydney City Centre Capacity Improve
- Page 101 and 102: Sydney City Centre Capacity Improve
- Page 103 and 104: Sydney City Centre Capacity Improve
- Page 105 and 106: Sydney City Centre Capacity Improve
- Page 107 and 108: Sydney City Centre Capacity Improve
- Page 109 and 110: Liverpool Street to Eager Lane Jame
- Page 111 and 112: Hay Street to Rawson Place Goulburn
- Page 113 and 114: Abercrombie Street intersection Ref
- Page 115 and 116: Ref (refer Fig 3-10 to 3-16) Propos
3 Description <strong>of</strong> the proposal<br />
The proposal is described in this chapter.<br />
3.1 The proposal<br />
3.1.1 Proposal footprint<br />
The proposal comprises traffic capa<strong>city</strong> improvement work at 17 locations across<br />
the <strong>city</strong> <strong>centre</strong>, which combine to form the proposal footprint. Figure 1-1 shows the<br />
proposal footprint. Figure 3-1 to Figure 3-22 show the extent <strong>of</strong> the proposed work in<br />
each <strong>of</strong> the 17 locations and the detail <strong>of</strong> the improvements that would be<br />
implemented.<br />
Table 3-1 provides an overview <strong>of</strong> the five precincts and 17 work sites. The start and<br />
end point for each work site has been identified by a major intersection for ease <strong>of</strong><br />
reference. The work sites have been broken down into sections, as detailed in<br />
Table 3-1. Work would not take place in all sections, as shown in Table 3-3.<br />
Table 3-1<br />
Overview <strong>of</strong> precincts, work sites and road sections<br />
Work site reference Section Start and end point<br />
Precinct 1: north-west<br />
A Margaret Street intersection<br />
B Margaret Street to Erskine Street<br />
NW1 Kent Street C Erskine Street intersection<br />
D Erskine Street to King Street<br />
E King Street intersection<br />
A Sussex Street intersection<br />
B Sussex Street to Kent Street<br />
C Kent Street intersection<br />
D Kent Street to Clarence Street<br />
E Clarence Street intersection<br />
F Clarence Street to York Street<br />
NW2 King Street G York Street intersection<br />
H York Street to George Street<br />
I George Street intersection<br />
J George Street to Pitt Street<br />
K Pitt Street intersection<br />
L Pitt Street to Castlereagh Street<br />
M Castlereagh Street intersection<br />
Precinct 2: retail<br />
R1 Park Street A Pitt Street intersection<br />
A Kent Street intersection<br />
R2 Market Street<br />
B Kent Street to Clarence Street<br />
Sydney City Centre Capa<strong>city</strong> Improvement 50<br />
Review <strong>of</strong> Environmental Factors