No Impact Environmental safeguard Responsibility Timing<br />

51 Sediment-laden run<strong>of</strong>f<br />

across the entire proposal<br />

footprint.<br />

52 Accidental spillage and<br />

sediment-laden run<strong>of</strong>f<br />

across the entire proposal<br />

footprint and specifically<br />

the higher risk at NW2, R1,<br />

R2, R4, R5, S2, S3, S4,<br />

S5, S6, C1, C2 & F1.<br />

53 Flood event during<br />

construction and<br />

associated impacts on<br />

water quality (particularly at<br />

NW2 R2, R5, S3, S4, C1,<br />

F1 and F2).<br />

Geology and soils<br />

54 Risk <strong>of</strong> encountering<br />

historic contamination<br />

during construction.<br />

Greatest risk at S4 & S5.<br />

Keep all work site areas tidy through measures such as<br />

sweeping down all active works areas at the end <strong>of</strong> each work<br />

shift.<br />

Induct construction workforce on incident management<br />

procedures and make them aware <strong>of</strong> the spill kit locations and<br />

the reporting procedures.<br />

Prepare a contingency plan for a potential flood event during<br />

construction and outline evacuation procedures. The plan would<br />

include:<br />

Evaluation <strong>of</strong> what flood event would trigger the plan<br />

Evacuation procedures<br />

A map indicating the area that is flood prone and the<br />

locations where to evacuate.<br />

Prepare a contamination management plan (CMP) as a sub-plan<br />

<strong>of</strong> the CEMP to document the procedures to identify, test, store,<br />

and dispose <strong>of</strong> any potential contaminated material during<br />

construction. The following provisions would be included in the<br />

plan as a minimum:<br />

<br />

<br />

<br />

<br />

Contaminated Land Legislation and guidelines including any<br />

relevant licences and approvals to be obtained<br />

Locations <strong>of</strong> known or potential contamination and<br />

preparation <strong>of</strong> a map showing these locations<br />

Rehabilitation requirements, classification, transport and<br />

disposal requirements <strong>of</strong> any contaminated land within the<br />

construction footprint<br />

Contamination management measures including waste<br />

classification and reuse procedures and unexpected finds<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

Pre-construction<br />

Pre-construction<br />

and construction<br />

Pre-construction<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 451<br />

Review <strong>of</strong> Environmental Factors