No Impact Environmental safeguard Responsibility Timing<br />

39 Operational visual and<br />

streetscape impacts across<br />

the proposal footprint.<br />

<br />

Consider integrating the road furniture (eg using single poles<br />

for lighting, traffic lights and street signs) to reduce visual<br />

clutter<br />

Roads and<br />

Maritime<br />

Detailed design<br />

<br />

Ensure the operational proposal design remains consistent<br />

with the established streetscape and key components<br />

therein. Ensure reference points, viewpoints and relationships<br />

are unaffected.<br />

40 Operational streetscape<br />

and visual impacts at the<br />

most sensitive locations.<br />

<br />

<br />

Assess the operational visual impacts against the detailed<br />

design<br />

Modify the detailed design to minimise its visual impacts<br />

Roads and<br />

Maritime<br />

Detailed design<br />

<br />

Consider the use <strong>of</strong> landscape planting or kerbside<br />

treatments to limit the ‘intensification’ <strong>of</strong> traffic in the available<br />

street space<br />

<br />

Work with the affected visual receivers to develop appropriate<br />

safeguards and design solutions that best protect their<br />

interests.<br />

41 Tree removal at R2, C1, S6<br />

and F1.<br />

<br />

<br />

Undertake an arboricultural assessment prior to construction<br />

Confirm that any required excavation works are ideally<br />

located away from trees where large structural roots may be<br />

impacted or plan for their protection and management as<br />

described below.<br />

Construction<br />

contractor<br />

Pre-construction<br />

42 Tree removal and pruning<br />

at<br />

R2, S5, S6, C1, C2, and<br />

F1.<br />

Develop and implement a tree management plan (TrMP) as a<br />

sub-plan <strong>of</strong> the CEMP:<br />

<br />

Establish tree protection zones close to overhanding<br />

branches to minimise any required pruning in relation to<br />

vehicle and equipment access, traffic diversions and<br />

construction zones<br />

Construction<br />

contractor<br />

Pre-construction/<br />

Construction<br />

Establish the controls in accordance with AS4970: 2009 –<br />

Protection <strong>of</strong> Trees on Development Sites<br />

<br />

Install fencing around the zones, or where this is not possible<br />

provide trunk, ground and branch protection as set out<br />

Sydney City Centre Capa<strong>city</strong> Improvement 447<br />

Review <strong>of</strong> Environmental Factors