24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

No Impact Environmental safeguard Responsibility Timing<br />

21 Potential for construction<br />

vibration causing structural<br />

damage and human<br />

discomfort across at all<br />

work sites except F1 and<br />

F2.<br />

22 Potential noise and<br />

vibration nuisance and<br />

amenity impacts during<br />

construction. Affects the<br />

entire proposal footprint.<br />

Non-Aboriginal heritage<br />

Undertake a location-specific vibration assessment prior to<br />

construction where there is the planned use <strong>of</strong> a vibratory roller.<br />

The survey should assess all receivers within the distance limits<br />

specified in Table 6-15 depending on the size <strong>of</strong> vibratory roller<br />

that would be used on site.<br />

Undertake the following actions in locations where there is the<br />

potential for vibration impacts:<br />

Building condition surveys for any locations identified to be<br />

within the safe working distance both before and after the<br />

works to identify existing damage and any damage due to<br />

the works<br />

Vibration monitoring during vibration intensive works<br />

In the case that exceedances are detected, <strong>review</strong> the<br />

situation and identify means to minimise impacts to residents<br />

and the appropriate changes made and the CNVMP updated<br />

accordingly.<br />

Restrict the use <strong>of</strong> any vibratory rollers above four tonnes.<br />

If this is not feasible implement respite periods to manage<br />

human comfort impacts.<br />

Provide a 24-hour community hotline for complaints and queries<br />

concerning construction and advertise this ahead <strong>of</strong> starting any<br />

work.<br />

Develop a complaints handling procedure.<br />

Inform the community in advance <strong>of</strong> commencing any planned<br />

works, through advertisement, flyers and community consultation<br />

sessions.<br />

Make the construction program available to the community and<br />

ensure it is routinely updated as works progress.<br />

Note: the above actions would be undertaken as part <strong>of</strong> the<br />

consultation strategy described in section 5.6.<br />

Construction<br />

contractors<br />

Construction<br />

contractor<br />

Pre-construction<br />

Pre-construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 441<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!