24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No Impact Environmental safeguard Responsibility Timing<br />

16 The potential for<br />

exceedance <strong>of</strong> the NMLs<br />

across the proposal<br />

footprint.<br />

17 The potential for<br />

exceedance <strong>of</strong> the NMLs<br />

across the proposal<br />

footprint.<br />

18 The potential for<br />

exceedance <strong>of</strong> the NMLs<br />

across the proposal<br />

footprint.<br />

19 The potential for<br />

exceedance <strong>of</strong> the NMLs<br />

across the proposal<br />

footprint.<br />

20 The potential for<br />

exceedance <strong>of</strong> the NMLs<br />

across the proposal<br />

footprint.<br />

any changes in noise and vibration. Tool box talks would be used<br />

to communicate constructor obligations and responsibilities<br />

under the plan.<br />

Further investigate all feasible and reasonable safeguards and<br />

management measures for affected receivers in accordance with<br />

Road Noise Policy (DECCW, 2011) and Environmental Noise<br />

Management Manual Practice Note 4 (Roads and Maritime,<br />

2001).<br />

Locate fixed plant as far from residences as possible and behind<br />

site structures.<br />

Restrict the use <strong>of</strong> reversing alarms where it is feasible<br />

notwithstanding worker and public health and safety<br />

requirements.<br />

Aim to schedule delivery times to within the recommended<br />

standard hours for construction notwithstanding the need to<br />

avoid peak periods where possible.<br />

Out <strong>of</strong> hours working would comply with the requirements <strong>of</strong><br />

quality assurance specification G36 relating to community<br />

notification requirements.<br />

Roads and<br />

Maritime<br />

Construction<br />

contractors<br />

Construction<br />

contractors<br />

Construction<br />

contractors<br />

Construction<br />

contractors<br />

Detailed design<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 440<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!