7.2 Summary <strong>of</strong> safeguards and management measures<br />

Table 7-1 identifies the protective measures that would be implemented to safeguard against any adverse effects introduced across the<br />

proposal’s lifecycle.<br />

Table 7-1<br />

Summary <strong>of</strong> proposal-specific safeguards and management measures<br />

No Impact Environmental safeguard Responsibility Timing<br />

General measures<br />

1 Start <strong>of</strong> work on site. Notify Roads and Maritime at least five days prior to starting<br />

onsite<br />

2 Pollution prevention control. Prepare an <strong>environmental</strong> work method statement (EWMS) for:<br />

Clearing and grubbing<br />

Earthworks<br />

Drainage works<br />

Utilities works.<br />

Submit the EWMS to Roads and Maritime for <strong>review</strong> and<br />

endorsement prior to commencement <strong>of</strong> works.<br />

As a minimum Include the following information in each EWMS:<br />

Description <strong>of</strong> the works/activities including machinery<br />

Outline <strong>of</strong> the sequence <strong>of</strong> work/activities, including<br />

interfaces with other construction activities (for example the<br />

interface between cut and fill areas, stabilisation <strong>of</strong> exposed<br />

areas, excavation for an installation or upgrade <strong>of</strong> culverts)<br />

Identification <strong>of</strong> potential <strong>environmental</strong> risks/impacts due to<br />

the works/activities which is to include risks associated with<br />

wet weather events<br />

Evaluation <strong>of</strong> methods to eliminate/reduce the <strong>environmental</strong><br />

risk<br />

Mitigation measures to reduce <strong>environmental</strong> risk<br />

Any safeguards resulting from consultation with public<br />

authorities and other stakeholders, where appropriate<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Pre-construction<br />

Pre-construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 435<br />

Review <strong>of</strong> Environmental Factors