24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Effect<br />

Affected<br />

<strong>factors</strong>/receivers<br />

Location<br />

(refer to Figure 3-1 to<br />

Figure 3-5)<br />

and lane restrictions<br />

Temporary bus journey time delays<br />

or re-routing on primary, secondary<br />

and tertiary bus corridors due to<br />

traffic management controls<br />

<br />

Public transport<br />

patrons<br />

The entire proposal<br />

footprint<br />

Temporary loss <strong>of</strong> access to mobility<br />

parking due to adjacent footpath and<br />

lane restrictions<br />

<br />

Mobility impaired<br />

patrons<br />

Work sites R4, R5, S1<br />

and C2<br />

Temporary loss <strong>of</strong> access to other<br />

kerbside provisions (eg parking,<br />

loading) due to adjacent footpath and<br />

lane restrictions<br />

<br />

<br />

Road users<br />

Adjacent<br />

businesses and<br />

deliveries<br />

The entire proposal<br />

footprint<br />

<br />

Roadside<br />

properties<br />

Temporary access restrictions or<br />

delays to <strong>of</strong>f-street accesses due to<br />

adjacent footpath and lane<br />

restrictions<br />

<br />

<br />

Adjacent<br />

businesses and<br />

deliveries<br />

Roadside<br />

properties<br />

Work sites NW1, NW2,<br />

R3, R4, R5, S1, S2, S3,<br />

S4 S5, C1, C2 and F1<br />

<br />

Members <strong>of</strong> the<br />

public<br />

Temporary reduction in ability to<br />

readily navigate around the <strong>city</strong><br />

<strong>centre</strong> due to regular lane changes<br />

and altered traffic priorities<br />

Road users The entire proposal<br />

footprint<br />

Noise and vibration impacts<br />

Temporary exceedance <strong>of</strong> noise<br />

management levels and potential for<br />

sleep disturbance due to the<br />

occasional short-term use <strong>of</strong> certain<br />

construction equipment<br />

<br />

<br />

Residents<br />

Other sensitive<br />

receivers<br />

The entire proposal<br />

footprint<br />

Potential for groundborne noise<br />

levels to be audible within theatres,<br />

cinemas and recording studios due to<br />

the occasional short-term use <strong>of</strong><br />

certain construction equipment<br />

<br />

<br />

<br />

Theatres<br />

Cinemas<br />

Recording studios<br />

Work sites NW2, R1,<br />

R2, R4, S3, S4 and F1<br />

Potential temporary human comfort<br />

impacts due to the occasional and<br />

short-term use <strong>of</strong> key vibration<br />

generating equipment<br />

<br />

<br />

Residents<br />

Other sensitive<br />

receivers<br />

The entire proposal<br />

footprint excluding work<br />

sites F1 and F2<br />

Socioeconomic impacts<br />

Temporary amenity effects on<br />

kerbside businesses including cafés,<br />

restaurants and hotels that use the<br />

footpath for outdoor seating and<br />

<br />

<br />

Businesses<br />

Patrons<br />

The entire proposal<br />

footprint<br />

Sydney City Centre Capa<strong>city</strong> Improvement 430<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!