24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cumulative effect<br />

Key issues<br />

Street, R5: York Street,C2: College Street and F1: Macquarie Street. The cumulative impact would depend on the timing<br />

and staging overlap between these other projects and this proposal.<br />

The visual impacts <strong>of</strong> all projects and this proposal would be safeguarded and managed through the use <strong>of</strong> appropriate<br />

screening and hoarding. The construction staging and program would be developed cognisant <strong>of</strong> the visual impacts <strong>of</strong><br />

other projects due to their timing and program, with specific areas <strong>of</strong> conflict identified in the construction traffic<br />

management plan (refer to section 6.1.4). Conflict would be managed by:<br />

Scheduling work to avoid cumulative interactions with other projects<br />

Introducing or retaining visual screening and hoarding for longer periods than needed to just service this proposal to<br />

manage additive and cumulative visual impacts.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 424<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!