24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project Description Location and interface with the<br />

proposal (spatial parameters)<br />

CityOne<br />

(Thakral<br />

Holdings)<br />

383 George<br />

Street (Fife<br />

Capital)<br />

APDG site<br />

commercial<br />

development<br />

(various<br />

developers)<br />

Sydney City<br />

Centre<br />

Cycleways<br />

projects<br />

Upgrade <strong>of</strong> Wynyard Station, including upgrade to<br />

eastern access ways to station, a new five-level retail<br />

area and new 29 storey <strong>of</strong>fice building. Demolition <strong>of</strong><br />

Menzies Hotel on-site.<br />

Proposed demolition <strong>of</strong> existing buildings and new multistorey<br />

mixed use development, including commercial<br />

and retail.<br />

Commercial redevelopment including:<br />

Demolition <strong>of</strong> existing buildings<br />

Rebuild <strong>of</strong> new commercial, residential and retail<br />

towers<br />

Public domain improvements.<br />

Roads and Maritime, Transport for NSW and City <strong>of</strong><br />

Sydney Council propose to remove, relocate and<br />

construct new cycleway infrastructure to support the<br />

implementation <strong>of</strong> the Access Strategy.<br />

York Street<br />

R4: Clarence Street (50 metres<br />

east)<br />

R5: York Street (100 metres<br />

north).<br />

George Street<br />

NW2: King Street (50 metres<br />

south)<br />

R5: York Street (50 metres east).<br />

Alfred Street, Pitt Street, Dalley<br />

Street, George Street and Circular<br />

Quay<br />

R5: York Street (500 metres<br />

north-east).<br />

College Street, Castlereagh Street,<br />

Campbell Street and Park Street<br />

NW2: King Street (overlap)<br />

R1: Park Street (overlap)<br />

R2: Market Street (overlap)<br />

C2: College Street (overlap).<br />

Status (temporal<br />

parameters)<br />

Concept plan approved<br />

(2012)<br />

Timing unknown<br />

(anticipated four year<br />

construction program).<br />

Under construction<br />

Completion date end <strong>of</strong><br />

2016.<br />

Under construction<br />

Phased operation 2015 to<br />

2017.<br />

Only the Castlereagh<br />

Street and College<br />

Street proposal is<br />

approved:<br />

Construction from<br />

early 2015<br />

Completion date<br />

early-to-mid 2015.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 414<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!