24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.15.2 Other committed and/or approved development<br />

A number <strong>of</strong> other committed projects will be under construction or operation within<br />

the <strong>city</strong> <strong>centre</strong> at the same time as the proposal. These are outlined within<br />

Table 6-67, with bolded text indicating where spatial or temporal parameters for<br />

these projects are expected to overlap with the proposal, based on available<br />

information. Some <strong>of</strong> the un-bolded projects have potential to spatially overlap with<br />

the proposal; however the construction timing <strong>of</strong> these projects is not yet confirmed.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 412<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!