6.14.4 Safeguards and management measures<br />

Table 6-66 lists the safeguards and management measures that would be<br />

implemented to addressed the hazards identified above in section 6.14.3.<br />

Section 6.12.4 describes the proposed dust and pollutant control safeguards and<br />

management measures. Section 6.2.5 describes the proposed noise and vibration<br />

safeguards and management measures.<br />

Table 6-66<br />

Hazards and risks safeguards and management measures<br />

Impact Environmental safeguard Responsibility Timing<br />

Construction<br />

hazard and risk<br />

management<br />

across the<br />

proposal<br />

Accidental<br />

spillage and<br />

discharge<br />

across the<br />

proposal during<br />

construction<br />

Workforce and<br />

pedestrian and<br />

cyclist safety<br />

during<br />

construction<br />

across the<br />

proposal<br />

Workforce and<br />

pedestrian and<br />

cyclist safety<br />

during<br />

construction<br />

across the<br />

proposal<br />

Workforce and<br />

pedestrian and<br />

cyclist safety<br />

during<br />

construction<br />

across the<br />

proposal<br />

Prepare a hazard and risk<br />

management plan (HRMP) as a<br />

sub-plan <strong>of</strong> the CEMP. As a<br />

minimum, the plan would:<br />

Include an emergency<br />

response plan<br />

Be prepared by a suitably<br />

qualified hazard management<br />

specialist<br />

Provide for the<br />

implementation, monitoring<br />

and maintenance <strong>of</strong> the<br />

identified hazard controls.<br />

<br />

<br />

Keep wet and dry spill kit,<br />

sand-filled/gravel-filled socks<br />

and geotextile matting ‘onsite’<br />

at all times.<br />

Train staff in the appropriate<br />

deployment, use, removal<br />

and disposal <strong>of</strong> spill kit.<br />

Fence <strong>of</strong>f and secure all work<br />

sites to prevent public access.<br />

Backfill or cover all open<br />

excavations with boards/plates<br />

outside <strong>of</strong> working hours.<br />

Retain exclusion fencing and<br />

traffic control measures at all<br />

times unless their removal is a<br />

condition <strong>of</strong> the road occupancy<br />

licence (ROL) in which case<br />

make the construction site safe<br />

and demobilise between<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Preconstruction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 409<br />

Review <strong>of</strong> Environmental Factors