24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Impact Environmental safeguard Responsibility Timing<br />

where they are<br />

cost and<br />

performance<br />

competitive<br />

and<br />

comparable in<br />

<strong>environmental</strong><br />

performance<br />

Use low<br />

embodied<br />

energy<br />

materials<br />

where they are<br />

cost and<br />

performance<br />

competitive<br />

and<br />

comparable in<br />

<strong>environmental</strong><br />

performance<br />

Use recycled<br />

materials<br />

where they are<br />

cost and<br />

performance<br />

competitive<br />

and<br />

comparable in<br />

<strong>environmental</strong><br />

performance.<br />

Maintain and<br />

reduce vehicle<br />

emissions for<br />

the whole<br />

proposal<br />

Manage the<br />

design to<br />

accommodate<br />

the climate<br />

change <strong>factors</strong><br />

<strong>of</strong> increased<br />

temperature<br />

and rainfall<br />

events across<br />

the whole<br />

proposal<br />

policy.<br />

Ensure the detailed design<br />

considers opportunities to<br />

reduce construction material<br />

quantities.<br />

Use recycled materials where<br />

possible and failing that use<br />

materials with a high recycled<br />

content.<br />

Aim to reduce the proposal’s<br />

transport footprint (haul<br />

distance) by purchasing<br />

materials and disposing <strong>of</strong><br />

waste locally.<br />

Adopt the latest pavement<br />

design to ensure resilience<br />

against extreme temperature<br />

and rainfall events.<br />

Roads and<br />

Maritime<br />

Construction<br />

contractor<br />

Construction<br />

contractor<br />

Roads and<br />

Maritime<br />

Detailed<br />

design<br />

Preconstruction<br />

Construction<br />

Construction<br />

Detailed<br />

design<br />

Sydney City Centre Capa<strong>city</strong> Improvement 405<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!