24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Impact Environmental safeguard Responsibility Timing<br />

Low residual<br />

risk <strong>of</strong><br />

generating ASS<br />

during<br />

construction<br />

(particularly at<br />

work sites NW2<br />

and R3)<br />

<br />

contaminated liquid waste<br />

A stop work procedure in<br />

the event that indications <strong>of</strong><br />

contamination are<br />

encountered (known and<br />

unexpected, including<br />

odorous or visual<br />

indicators) and for a<br />

contamination assessment<br />

to be prepared to advise on<br />

the need for remediation or<br />

other action, as deemed<br />

appropriate<br />

A process for <strong>review</strong>ing and<br />

updating the plan.<br />

Note: The CMP would be<br />

<strong>review</strong>ed by Roads and<br />

Maritime prior to construction.<br />

Prepare an ASS Management<br />

Plan in accordance with the<br />

Guidelines for the Management<br />

<strong>of</strong> Acid Sulphate Materials<br />

(Roads and Maritime, 2005) if it<br />

is confirmed through further<br />

assessment and sampling that<br />

the soils trigger the action<br />

criteria in the ASS Manual<br />

(ASSMAC, 1998)<br />

Ensure the plan details the<br />

controls needed when<br />

undertaking the works such<br />

that they would not lead to<br />

undue oxidation <strong>of</strong> the soil and<br />

therefore its acidification.<br />

Construction<br />

contractor<br />

Preconstruction<br />

Construction<br />

6.9 Biodiversity<br />

This section identifies and assesses the proposal’s potential impacts on biodiversity.<br />

6.9.1 Method<br />

Study area<br />

The biodiversity study area considered the ecological values within the five precincts<br />

and across a wider locality covering up to 10 kilometres. Appendix J contains the<br />

detailed data search results.<br />

Method and assessment criteria<br />

The biodiversity assessment was undertaken with regards to:<br />

Environmental Impact Assessment Practice Note: Biodiversity Assessment<br />

(EIA-N06) (Roads and Maritime, 2011)<br />

Sydney City Centre Capa<strong>city</strong> Improvement 381<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!