24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Geology and soil impacts during operation<br />

The proposal would not increase the risk or likelihood for sediment-laden run<strong>of</strong>f or an<br />

accidental spillage once operational. The operational management <strong>of</strong> these two<br />

impacts forms an ongoing issue for Roads and Maritime outside <strong>of</strong> the context <strong>of</strong> this<br />

proposal. Consequently, there would be no operational impacts.<br />

6.8.4 Safeguards and management measures<br />

Table 6-55 lists the geology and soils safeguards and management measures that<br />

would be implemented to address the impacts identified above in section 6.8.3. The<br />

management <strong>of</strong> accidental spills, management <strong>of</strong> sediment-laden run<strong>of</strong>f and control<br />

<strong>of</strong> dust during construction are safeguarded under the proposed measures identified<br />

in section 6.7.4 and section 6.12.4 respectively.<br />

Table 6-55<br />

Geology and soils safeguards and management measures<br />

Impact Environmental safeguard Responsibility Timing<br />

Risk <strong>of</strong><br />

encountering<br />

historic<br />

contamination<br />

during<br />

construction.<br />

Greatest risk at<br />

S4 & S5<br />

Prepare a contamination<br />

management plan (CMP) as a<br />

sub-plan <strong>of</strong> the CEMP to<br />

document the procedures to<br />

identify, test, store, and dispose<br />

<strong>of</strong> any potential contaminated<br />

material during construction.<br />

The following provisions would<br />

be included in the plan as a<br />

minimum:<br />

<br />

<br />

<br />

<br />

<br />

Contaminated Land<br />

Legislation and guidelines<br />

including any relevant<br />

licences and approvals to<br />

be obtained<br />

Locations <strong>of</strong> known or<br />

potential contamination and<br />

preparation <strong>of</strong> a map<br />

showing these locations<br />

Rehabilitation requirements,<br />

classification, transport and<br />

disposal requirements <strong>of</strong><br />

any contaminated land<br />

within the construction<br />

footprint<br />

Contamination<br />

management measures<br />

including waste<br />

classification and reuse<br />

procedures and unexpected<br />

finds procedures<br />

Monitoring and sampling<br />

procedure for landfill<br />

seepage (leachate)<br />

Construction<br />

contractor<br />

Preconstruction<br />

Construction<br />

A procedure for dewatering<br />

and disposal <strong>of</strong> potentially<br />

Sydney City Centre Capa<strong>city</strong> Improvement 380<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!