24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Impact Environmental safeguard Responsibility Timing<br />

Sediment-laden<br />

run<strong>of</strong>f across the<br />

entire proposal<br />

footprint<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Separation <strong>of</strong> on-site and<br />

<strong>of</strong>f-site water<br />

The direction <strong>of</strong> run-<strong>of</strong>f and<br />

drainage points during each<br />

stage <strong>of</strong> construction<br />

Dewatering plan which<br />

includes process for<br />

monitoring, flocculating and<br />

dewatering water from site<br />

(ie formation or excavations)<br />

A mapped plan identifying<br />

the above<br />

Include progressive site<br />

specific Erosion and<br />

Sedimentation Control Plans<br />

(ESCPs). The ESCP is to be<br />

updated at least fortnightly<br />

A process to routinely<br />

monitor the Bureau <strong>of</strong><br />

Meteorology weather<br />

forecast<br />

Preparation <strong>of</strong> a wet weather<br />

(rain event) plan which<br />

includes a process for<br />

monitoring potential wet<br />

weather and identification <strong>of</strong><br />

controls to be implemented<br />

in the event <strong>of</strong> wet weather.<br />

These controls are to be<br />

shown on the ESCPs<br />

Provision <strong>of</strong> an inspection<br />

and maintenance schedule<br />

for ongoing maintenance <strong>of</strong><br />

temporary and permanent<br />

erosion and sedimentation<br />

controls.<br />

Note: the plan would be provided<br />

to Roads and Maritime for <strong>review</strong><br />

and verification prior to starting<br />

construction.<br />

Keep all work site areas tidy<br />

through measures such as<br />

sweeping down all active works<br />

areas at the end <strong>of</strong> each work<br />

shift.<br />

Construction<br />

contractor<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 372<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!