Impact Environmental safeguard Responsibility Timing<br />

Tree removal at<br />

R2, C1, S6 and<br />

F1<br />

<br />

Undertake an arboricultural<br />

assessment prior to<br />

construction<br />

Construction<br />

contractor<br />

Preconstruction<br />

<br />

Confirm that any required<br />

excavation works are ideally<br />

located away from trees<br />

where large structural roots<br />

may be impacted or plan for<br />

their protection and<br />

management as described<br />

below.<br />

Tree removal<br />

and pruning at<br />

R2, S5, S6, C1,<br />

C2, and F1<br />

Develop and implement a tree<br />

management plan (TrMP) as a<br />

sub-plan <strong>of</strong> the CEMP<br />

<br />

Establish tree protection<br />

zones close to overhanding<br />

branches to minimise any<br />

required pruning in relation to<br />

vehicle and equipment<br />

access, traffic diversions and<br />

construction zones<br />

Construction<br />

contractor<br />

Preconstruction/<br />

Construction<br />

<br />

Establish the controls in<br />

accordance with AS4970:<br />

2009 – Protection <strong>of</strong> Trees on<br />

Development Sites<br />

<br />

Install fencing around the<br />

zones, or where this is not<br />

possible provide trunk, ground<br />

and branch protection as set<br />

out below.<br />

Tree removal<br />

and pruning at<br />

R2, S5, S6, C1,<br />

C2, and F1<br />

Prepare a tree management plan<br />

(TrMP) as a sub-plan <strong>of</strong> the<br />

CEMP. As a minimum, the plan<br />

would:<br />

<br />

Provide for traffic management<br />

diversions that would be<br />

cognisant <strong>of</strong> the potential<br />

impact on low overhanging<br />

branches<br />

Construction<br />

contractor<br />

Preconstruction/<br />

Construction<br />

<br />

Prevent materials storage or<br />

machinery movements within<br />

the tree protection zones<br />

unless the existing pavement<br />

is in place or particular ground<br />

protection measures are<br />

installed<br />

<br />

Avoid excavation within the<br />

tree protection zones wherever<br />

possible<br />

Sydney City Centre Capa<strong>city</strong> Improvement 363<br />

Review <strong>of</strong> Environmental Factors