24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 6-48<br />

Landscape character and visual impact safeguards and management<br />

measures<br />

Impact Environmental safeguard Responsibility Timing<br />

Management <strong>of</strong><br />

the construction<br />

works to<br />

minimise their<br />

visual impacts<br />

and localised<br />

effect on<br />

streetscape<br />

character<br />

<br />

<br />

Erect screening and hoardings<br />

around each major traffic<br />

capa<strong>city</strong> improvement scheme<br />

where viable<br />

Implement a maintenance<br />

schedule to ensure the work<br />

sites remain clear and tidy,<br />

including the key entry and exit<br />

points<br />

Construction<br />

contractor<br />

Construction<br />

<br />

For minor work sites consider<br />

alternative screen methods<br />

(eg low bollards) to reduce the<br />

visual impact <strong>of</strong> the work site<br />

Light spill<br />

impacts during<br />

construction<br />

across the<br />

proposal<br />

footprint<br />

<br />

<br />

Screen, shield and cut-<strong>of</strong>f all<br />

temporary site lighting to<br />

prevent light spill where<br />

possible<br />

Use directional light sources<br />

where possible to reduce<br />

lateral light spill<br />

Construction<br />

contractor<br />

Construction<br />

<br />

Use low luminescence lighting<br />

lights where feasible to reduce<br />

the lateral light spill<br />

<br />

Shield the top <strong>of</strong> all site<br />

lighting to prevent any upward<br />

light glare<br />

<br />

Remove any lighting conflict<br />

with the general street lighting<br />

to prevent the risk <strong>of</strong> motorists<br />

becoming disorientated or<br />

distracted<br />

<br />

Consult with City <strong>of</strong> Sydney to<br />

agree the hours when outdoor<br />

lighting can be used at night to<br />

service the works sites and<br />

manage this through the<br />

CEMP<br />

Visual impacts<br />

during<br />

construction at<br />

sensitive<br />

locations<br />

<br />

<br />

Implement additional visual<br />

controls at the more visually<br />

sensitive locations<br />

Use sensitive screenings and<br />

hoardings around these sites,<br />

potentially involving printed<br />

artwork or backdrops <strong>of</strong> the<br />

adjacent buildings or low-level<br />

bollards where applicable<br />

Construction<br />

contractor<br />

Construction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 361<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!