24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Work site<br />

G: Campbell Street<br />

intersection<br />

C2: College Street<br />

A: Macquarie Street<br />

intersection<br />

B: Macquarie Street to<br />

Prince Albert Road<br />

C: Prince Albert Road<br />

intersection<br />

D: Prince Albert Road to<br />

Park Street<br />

Traffic capa<strong>city</strong><br />

improvement<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

5: Kerbside<br />

allocation<br />

modifications<br />

6: Lane<br />

arrangements<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

5: Kerbside<br />

allocation<br />

modifications<br />

Impact summary<br />

Movement: Improvements to vehicular connectivity and movement<br />

Social infrastructure: Alteration/reduction <strong>of</strong> the north east kerb extension from St James Road<br />

into Macquarie Street reducing pedestrian capa<strong>city</strong> and amenity<br />

Amenity: Loss <strong>of</strong> parking provisions during the morning, inter and afternoon weekday peak<br />

periods affecting those that rely on use <strong>of</strong> these provisions to access the <strong>city</strong> for commuting,<br />

recreation, shopping and other uses leading to amenity changes<br />

Amenity: Pruning <strong>of</strong> two trees<br />

Movement: Creation <strong>of</strong> ‘no stopping’ zone resulting in improvements to vehicular connectivity<br />

and movement especially due to the reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the<br />

CSELR<br />

Movement: Improvements to vehicular connectivity and movement especially due to the<br />

reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the CSELR<br />

Movement: Improvements to vehicular connectivity and movement especially due to the<br />

reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the CSELR<br />

Amenity: Permanent loss <strong>of</strong> motorcycle parking reducing amenity and access for this user<br />

group across the week including those that rely on these provisions for commuting, recreation<br />

and other uses<br />

Amenity: Loss <strong>of</strong> parking provisions full time affecting those that rely on use <strong>of</strong> these provisions<br />

to access the <strong>city</strong> for commuting, recreation, shopping and other uses leading to amenity<br />

changes<br />

Movement: Creation <strong>of</strong> ‘no stopping’ zone resulting in improvements to vehicular connectivity<br />

and movement especially due to the reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the<br />

CSELR<br />

Sydney City Centre Capa<strong>city</strong> Improvement 319<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!