24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Work site<br />

C: Wattle Street<br />

intersection (left slip lane)<br />

D: Abercrombie Street<br />

intersection<br />

S6: Pitt Street<br />

A: Pitt Street and<br />

George Street<br />

intersection<br />

B: George Street and<br />

Quay Street intersection<br />

Traffic capa<strong>city</strong><br />

improvement<br />

2: Kerb<br />

extension<br />

alterations<br />

5: Kerbside<br />

allocation<br />

modifications<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

2: Kerb<br />

extension<br />

alterations<br />

2: Kerb<br />

extension<br />

alterations<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

Impact summary<br />

Social infrastructure: Removal pedestrian island on the intersection, creation/extension <strong>of</strong> the<br />

western kerb extension on the Wattle Street slip road, creation/extension <strong>of</strong> the eastern kerb<br />

extension on the Wattle Street slip road and creation/extension pf the pedestrian island on the<br />

intersection reducing pedestrian capa<strong>city</strong> and amenity<br />

Amenity: Loss <strong>of</strong> parking provisions during the morning, inter and afternoon weekday peak<br />

periods affecting those that rely on use <strong>of</strong> these provisions to access the <strong>city</strong> for commuting,<br />

recreation, shopping and other uses leading to amenity changes, with minor benefit from the<br />

introduction <strong>of</strong> drop-<strong>of</strong>f/pick-up indented parking bays<br />

Movement: Improvements to vehicular connectivity and movement especially due to the<br />

reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the CSELR<br />

Social infrastructure: Creation/extension <strong>of</strong> the north-east and north-west kerb on the<br />

intersection improving pedestrian capa<strong>city</strong> and amenity<br />

Movement: Improvements to vehicular connectivity and movement especially due to the<br />

reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the CSELR<br />

Public transport: Creation <strong>of</strong> a bus lane prioritising public transport within the road corridor<br />

Social infrastructure: Removal <strong>of</strong> the northern kerb extension between George Street and Pitt<br />

Street reducing pedestrian capa<strong>city</strong> and amenity<br />

Movement: Improvements to vehicular connectivity and movement especially due to the<br />

reallocation <strong>of</strong> traffic resulting from the construction <strong>of</strong> the CSELR<br />

Social infrastructure: Alteration/reduction <strong>of</strong> the western kerb footpath both sides <strong>of</strong> the Quay<br />

Street intersection reducing pedestrian capa<strong>city</strong> and amenity<br />

Amenity: Removal <strong>of</strong> one tree that would have a negligible effect on the area’s amenity<br />

Movement: Improvements to vehicular connectivity and movement<br />

Public transport: Reduce length <strong>of</strong> the bus lane reducing public transport prioritisation within<br />

the road corridor<br />

Sydney City Centre Capa<strong>city</strong> Improvement 316<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!