24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Work site<br />

F: Liverpool Street to<br />

Eager Lane<br />

H:Eager Lane to<br />

Goulburn Street<br />

S2: Goulburn Street<br />

A: George Street<br />

intersection<br />

S3: Pitt Street<br />

B: Liverpool Street to<br />

Goulburn Street<br />

Traffic capa<strong>city</strong><br />

improvement<br />

5: Kerbside<br />

allocation<br />

modifications<br />

5: Kerbside<br />

allocation<br />

modifications<br />

2: Kerb<br />

extension<br />

alterations<br />

5: Kerbside<br />

allocation<br />

modifications<br />

Impact summary<br />

leading to amenity changes<br />

Movement: Improvements to vehicular connectivity and movement particularly due to the future<br />

operation <strong>of</strong> Barangaroo<br />

Movement: Restricted use <strong>of</strong> two mobility spaces reducing access into the <strong>city</strong> throughout<br />

during the afternoon peak period<br />

Local economy: Effects on businesses not being able to unload goods during the weekday<br />

afternoon peak period<br />

Amenity: Loss <strong>of</strong> parking provisions during the weekday afternoon peak period affecting those<br />

that rely on use <strong>of</strong> these provisions to access the <strong>city</strong> for recreation, shopping and other uses<br />

leading to amenity changes<br />

Movement: Improvements to vehicular connectivity and movement particularly due to the future<br />

operation <strong>of</strong> Barangaroo<br />

Local economy: Effects on businesses not being able to unload goods at any time<br />

Social infrastructure: Alteration/reduction <strong>of</strong> the south-east kerb extension on the intersection<br />

reducing pedestrian capa<strong>city</strong> and amenity<br />

Movement: Improvements to vehicular connectivity and movement<br />

Local economy: Effects on businesses not being able to unload goods during the weekday<br />

morning peak period<br />

Local economy: Improvements in businesses being able to unload goods during the weekday<br />

inter peak period<br />

Amenity: Loss <strong>of</strong> parking provisions during the morning, inter and afternoon weekday peak<br />

periods affecting those that rely on use <strong>of</strong> these provisions to access the <strong>city</strong> for commuting,<br />

recreation, shopping and other uses leading to amenity changes<br />

Movement: Creation <strong>of</strong> ‘no stopping’ zone resulting in improvements to vehicular connectivity<br />

and movement<br />

Sydney City Centre Capa<strong>city</strong> Improvement 314<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!