Impact Environmental safeguard Responsibility Timing<br />

Temporary<br />

access<br />

restrictions<br />

during<br />

construction<br />

across the<br />

proposal<br />

footprint<br />

Temporary<br />

kerbside use<br />

restrictions<br />

during<br />

construction<br />

across the<br />

whole footprint<br />

Manage short-term access<br />

restrictions during<br />

construction<br />

Regulate traffic movements<br />

and minimise traffic switching<br />

during construction through<br />

implemented traffic controls<br />

Maintain continuous, safe<br />

and efficient traffic movement<br />

Identify haulage routes and<br />

minimise impacts on local<br />

routes<br />

Maintain local road and<br />

property access, including the<br />

use <strong>of</strong> temporary turn-around<br />

bays<br />

Maintain pedestrian and<br />

cyclist access throughout<br />

Provide warning and advisory<br />

signage<br />

Provide for local community<br />

consultation and notification<br />

<strong>of</strong> local road network and<br />

traffic impacts<br />

Identify and consider other<br />

construction works occurring<br />

in the area at the same time<br />

to minimise additive traffic<br />

conflict and congestion<br />

impacts.<br />

Note: the plan would be <strong>review</strong>ed<br />

by City <strong>of</strong> Sydney and CSTTC.<br />

Design the construction staging<br />

and program with the objective<br />

<strong>of</strong> minimising access restrictions<br />

in any one given location<br />

Avoid implementing driveway<br />

access restrictions during peak<br />

demand periods, which may vary<br />

throughout the day and over the<br />

week due to associated <strong>of</strong>f-street<br />

use.<br />

Affected businesses, residents<br />

and other road user groups<br />

would be notified in advance <strong>of</strong><br />

construction to describe the<br />

nature, location, extent and<br />

timing <strong>of</strong> the restrictions, as well<br />

as the location <strong>of</strong> the nearest<br />

available alternatives.<br />

Construction<br />

contractor<br />

Roads and<br />

Maritime<br />

Preconstruction<br />

Preconstruction<br />

Sydney City Centre Capa<strong>city</strong> Improvement 207<br />