Section<br />

Precinct 4: college<br />

C1: Wentworth Avenue<br />

A: Oxford Street intersection<br />

2: Kerb extension alterations<br />

South-east corner <strong>of</strong> the intersection<br />

D: Wemyss Lane to Goulburn Street<br />

3: Footpath width alterations<br />

Western footpath<br />

E: Goulburn Street intersection<br />

1: Intersection reconfiguration and<br />

geometry modifications<br />

Pedestrian island on the northbound to<br />

westbound slip lane <strong>of</strong> Wentworth<br />

Avenue to Goulburn Street<br />

C2: College Street<br />

A: Macquarie Street intersection<br />

1: Intersection reconfiguration and<br />

geometry modifications<br />

Northern footpath<br />

Relocation <strong>of</strong> mobility parking spaces<br />

B: Macquarie Street to Prince Albert<br />

Road to F: Park Street to Oxford Street<br />

1: Intersection reconfiguration and<br />

geometry modifications, 5: Kerbside<br />

allocation modifications and 6: Lane<br />

arrangements<br />

Precinct 5: financial<br />

F1: Macquarie Street<br />

B: Bent Street to Bridge Street<br />

2: Kerb extension alterations<br />

Western kerb<br />

Temporary footpath/cycleway restriction<br />

Long-term impact due to temporary footpath<br />

restriction/closure<br />

Long-term impact due to temporary footpath<br />

restriction/closure<br />

Long-term impact due to temporary footpath<br />

restriction/closure<br />

Long-term impact due to temporary footpath<br />

restriction/closure<br />

Potential short-term reduced access <strong>of</strong> the<br />

cycleway across the intersection due to traffic<br />

management controls<br />

Potential short-term reduced access <strong>of</strong> the<br />

cycleway across the intersection due to traffic<br />

management controls<br />

Long-term impact due to temporary footpath<br />

restriction/closure<br />

There is anticipated to be 23 locations where the footpath capa<strong>city</strong> would be<br />

restricted or reduced due to the need to install the more major traffic capa<strong>city</strong><br />

improvements during construction. These controls may be in place for the mediumto-long-term<br />

(ie over one month). The construction program and staging would<br />

confirm whether the footpath restrictions/reductions would remain in place<br />

permanently or whether they could be relaxed during peak periods. Also, there may<br />

be short-term temporary restrictions put in place that would affect access along the<br />

King Street, Kent Street and College Street cycleways. As a result <strong>of</strong> the above<br />

restrictions the following impacts would occur:<br />

Footpath restrictions would reduce capa<strong>city</strong> and accessibility for pedestrian<br />

movements in the <strong>city</strong> <strong>centre</strong>, which could increase footpath congestion during<br />

construction, noting that not all work sites would be under construction at the<br />

same time (refer to section 6.14)<br />

Sydney City Centre Capa<strong>city</strong> Improvement 180<br />

Review <strong>of</strong> Environmental Factors