24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The detailed design would also be developed in consultation with the above<br />

Government agencies, service and utility providers and businesses. This would<br />

ensure:<br />

An integrated response to traffic management throughout the <strong>city</strong> <strong>centre</strong> during<br />

construction<br />

· No significant impact on ‘public roads, road-related areas, traffic or transport’<br />

either during construction or once the proposal is implemented<br />

· Impacts on government-provided infrastructure are either avoided, safeguarded<br />

or managed<br />

· All public utilities are identified to ensure they are avoided or adjusted to<br />

prevent service interruptions<br />

· Any planned maintenance to existing property (eg phone booths, street signs)<br />

would be incorporated into the construction staging (refer to section 6.5)<br />

· Emergency access requirements would be incorporated into the detailed<br />

design (refer to section 6.14)<br />

· Any <strong>environmental</strong> safeguards and management measure refinements that<br />

would be needed to account for design changes during this period would be<br />

appropriate and suitable.<br />

5.6.3 Construction consultation<br />

The works contractor would be required to consult the local community during<br />

construction. This process would be managed through the construction<br />

<strong>environmental</strong> management Plan (CEMP, refer to section 3.3.1). It would include:<br />

· Issuing notices prior to starting construction and to relay information on traffic<br />

management controls, temporary road closures, temporary access restrictions<br />

and planned noisy activities<br />

· Undertaking door-knocking with affected residents<br />

· Undertaking ongoing consultation with affected parties comprising meetings,<br />

letter-drops, posters and notifications.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 166<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!