24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Traffic capa<strong>city</strong><br />

improvement<br />

Precinct 3: southern<br />

2: Kerb extension<br />

alterations<br />

Location and nature <strong>of</strong> works<br />

S5(C) Broadway: Wattle Street<br />

intersection<br />

Build-out the kerb extensions along the<br />

western kerb <strong>of</strong> the Wattle Street slip<br />

road<br />

Utility/drainage modification<br />

· Fibre optic cable<br />

· Water main<br />

· Drainage modifications<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

2: Kerb extension<br />

alterations<br />

2: Kerb extension<br />

alterations<br />

1: Intersection<br />

reconfiguration<br />

and geometry<br />

modifications<br />

Build-out the kerb extensions along the<br />

eastern kerb <strong>of</strong> the Wattle Street slip<br />

road<br />

Increase the size <strong>of</strong> the existing raised<br />

island to provide greater area for<br />

pedestrian refuge and improved<br />

geometry through the intersection<br />

S5(D) Broadway: Abercrombie Street<br />

intersection<br />

Reconfigure northbound lanes through<br />

the intersection to create one dedicated<br />

left-turn lane, two through lanes and one<br />

through and right-turn lane<br />

Retain existing north-east kerb on the<br />

intersection and built-out to provide the<br />

additional footway width<br />

Modify the existing kerb extension on the<br />

north-west corner <strong>of</strong> the intersection<br />

S6(A) Pitt Street: George Street<br />

intersection<br />

Reduce the northern kerb extension<br />

between George Street and Pitt Street to<br />

create an additional east bound through<br />

lane<br />

S6(B) Pitt Street: George Street and<br />

Quay Street intersection<br />

Marginally reduce the footpath width at<br />

the intersection <strong>of</strong> George Street and<br />

Quay Street to improve the geometry<br />

along George Street across the<br />

intersection<br />

· Electri<strong>city</strong> cable<br />

· Fibre optic cable<br />

· Water main<br />

· Drainage modifications<br />

· Communication cable<br />

· Electri<strong>city</strong> cable<br />

· Low pressure gas main<br />

· Water main<br />

· Drainage modifications<br />

· Communication cable<br />

· Electri<strong>city</strong> cable<br />

· Low pressure gas main<br />

· Sewer main<br />

· Water main<br />

· Drainage modifications<br />

Sydney City Centre Capa<strong>city</strong> Improvement 142<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!